Genie 3452535556 PCG, 3452535556 GCG manual Attach limit switches, Attach limit switch wires

Page 10

9.Attach limit switches.

2 switches included, “CLOSE” limit switch (brown wire) and “OPEN” limit switch (white wire)

(Fig. 1-10).

Turn set screws (39) into threaded holes, just enough so screw stays in place. (Fig. 1-10).

10

[39] #8-32 x 1"

Point arrow on top “CLOSE” limit switch toward door end of rail.

Place “CLOSE” limit switch (Brown wire) on rail about 12” from rail strap (Fig. 1-11).

Gently tighten set screw enough to keep switch from moving.

Point arrow on top “OPEN” limit switch toward door end of rail.

Place “OPEN” limit switch (white wire) on rail where chain attaches to carriage slide. (Near the power head.)

Gently tighten set screw enough to keep switch from moving.

10.Attach limit switch wires.

Uncoil limit switch wires.

Place into channels located along top of rail.

Run wires back to power head through hole in top of power head (Fig. 1-12).

Use wire clips to hold wires in place (Fig. 1-13).

FIG. 1-10 Identify limit switches / insert set screws.

FIG. 1-11 Place limit switches.

hole

[41]

Attach limit switch wires to terminals on power head (Fig. 1-14).

White wire (“OPEN”) to terminals #4 and #5.

Brown wire (“CLOSE”) to terminals #5 and #6.

Bundle extra wire and lay it on top of power head (Fig. 1-14 inset).

FIG. 1-12 Run wire to power head.

FIG. 1-13 Wire clips.

 

 

 

 

4

 

 

 

 

 

 

 

 

5

 

 

 

 

 

 

 

Bundle

 

 

 

 

Wire

 

6

 

 

 

 

 

 

 

 

 

 

FIG. 1-14 Attach wire at power head terminals.

Image 10
Contents Series GCG, PCG, H Things to consider if you are planning to do-it-yourself Typical Sectional Door Installation Typical 1-PIECE Door InstallationOperator Features Table of ContentsSafety Features Recommended Tools Parts Identification Not Shown Full SizePiece Rail Hardware Exploded View Power Head Exploded View Parts ListSafety Information Operator Assembly Open Blue Parts BAGSlip carriage into carriage slot of rail Attach rail to power headOpen Green Parts BAG Slip opposite no knot end through knobAttach limit switches Attach limit switch wiresFinding header bracket mounting location InstallationHeader and Door Mounting Brackets Marking final height12 2. Mounting the header bracket Open Orange Parts BAGDoor Bracket Finding door bracket mounting locationMounting the Operator Open Yellow Parts BAG Connecting the armsAttach the arms SAFE-T-BEAM System Installation Open RED Parts BAG Wiring cont’Check the following Finding the mounting location Wall Control InstallationWiring MountingWith Permanent Wiring Instructions for electricianAdjusting Open force Limit Switch / Force AdjustmentAdjusting limit switches Adjusting Close forceProgramming Remote Controls Single Button Remote Contact Reverse TestMULTI-BUTTON Remote Remote ControlLight BULB/LENS Installation Lost or Stolen RemoteDoor springs and hardware Maintenance Routine Monthly MaintenanceTroubleshooting Guide Door balanceStarts for Remote controlDoor operator No reasonWiring Diagram Transmitter Compliance StatementDistributor Garage Door Operator Accessories Order Form Genie CompanyLimited Warranty