3M CSFM1254 operating instructions Valve History

Page 11

Step 1

Step 1

Step 2

Step 3

Step 4

Step 5

Step 6

Step 7

Valve History

(Step 1) Press or simultaneously for 3 seconds and release. Then press and simultaneously and release. If screen, to the left, does not appear is 5 seconds the lock on the valve is activated. To unlock press , NEXT, and SET CLOCK in sequence, then press and . Then press and simultaneously and release.

(Step 2) Software Version: This display shows the software version of the valve. Press the NEXT but- ton to go to the next step or press REGEN to exit Valve History.

(Step 3) Flow rate, maximum since startup: This display shows the maximum flow rate in gallons per minute that has occurred since startup. This display will equal zero if a water meter is not function- ing. Press the NEXT button to go to the next step. Press REGEN to return to previous step.

(Step 4) Gallons, total used since start-up: This display shows the total gallons. This display shows the total days since start-up. Press the NEXT button to go to the next step. Press REGEN to return to previous step.

(Step 5) Days, total since start-up: This display shows the total days since start-up. Press the NEXT button to go to the next step. Press REGEN to return to previous step.

(Step 6) Regenerations, total number since start-up: This display shows the total number of regen- erations that have occurred since start-up. Press the NEXT button to go to the next step. Press REGEN to return previous step.

(Step 7) Error, number of occurrences since start-up: This display shows E and the total number of errors that have occurred since start-up. Press the NEXT button to exit Valve History. Press REGEN to return to previous step. To lock settings press , NEXT, and SET CLOCK in sequence.

RETURN T NORMAL MOD

3-3

Image 11
Contents Installation and Operating Instructions Explanation of Signal Word Consequences Important Notes Locate Water Conditioning Equipment Correctly Check Your Pumping Rate and Water PressureImportant Note Facts to Remember While Planning Your InstallationTypical Installation InstallationTo reduce the risk associated with a hazardous voltage Softener and Brine Tank ASSEMBLY, TOP ViewClamp Assembly Press Next and simultaneously for 3 seconds Installer Display SettingsControl Valve Programming and Regeneration Diagnostics Valve History General Operation User Display SettingsMaintenance Problem Possible Cause Solution Control Valve Troubleshooting GuideDrive Cap Assembly, Main Piston and Regenerant Piston Control Valve Service InstructionsDrive Assembly Water Meter or Meter Plug Spacer Stack AssemblyRefill Flow Control Assembly or Refill Port Plug Injector Cap, Screen, Injector Plug and InjectorBypass Valve Problem Cause Solution System Troubleshooting GuideCFSM1254 Specifications and Operating DataParts Drawing No Order No Description Quantity Front Cover and Drive AssemblyV3005 Injector Cap, Injector Screen, Injector, Plug and O-Ring Refill Flow Control Assembly Drain Line 3/4 Water Meter and Meter Plug Order No Description Fitting 1 Brass Sweat Assembly Order No Description Quantity Wrench Order No Fax

CSFM1254 specifications

The 3M CSFM1254 is a sophisticated communication headset designed specifically for industrial and construction environments where effective communication is critical. This headset combines advanced technology, comfort, and durability, making it an ideal choice for professionals who work in demanding conditions.

One of the standout features of the 3M CSFM1254 is its high-performance noise-canceling capabilities. The headset is equipped with advanced passive noise reduction technology that effectively reduces background noise, allowing users to communicate clearly even in noisy environments. This is particularly important in construction sites or manufacturing facilities where heavy machinery and equipment can create significant auditory distractions.

The 3M CSFM1254 utilizes a robust dual-ear design that provides enhanced sound isolation, further improving the user experience. The ear cups are designed for comfort, featuring cushioned padding that ensures a secure fit during extended use. This comfort, combined with an adjustable headband, allows for personalized fitting, making it suitable for all-day wear in various work situations.

Another highlight of the headset is its reliable communication capabilities. The built-in microphone is noise-canceling as well, which means that it fosters clear and effective communication by minimizing interference from surrounding noise. Users can expect consistent audio quality, enabling them to stay connected with colleagues and supervisors without the frustration of interrupted or inaudible conversations.

Durability is a defining characteristic of the 3M CSFM1254. It is constructed with high-quality materials that can withstand the rigors of challenging work environments. The headset has been tested for various impacts and environmental conditions, making it a reliable choice for those who need equipment that can keep up with their demanding work routines.

In terms of connectivity, the 3M CSFM1254 offers versatile options, allowing it to be easily integrated with various communication systems, including two-way radios and smartphones. This flexibility enhances workplace communication efficiency, enabling teams to coordinate tasks and safety measures effectively.

Overall, the 3M CSFM1254 headset stands out as a top choice for professionals who require reliable, clear communication and durability in their headsets. With its combination of noise-canceling technology, comfort, and robust build, it addresses the needs of those working in high-noise environments, ensuring they remain connected and safe while performing their tasks.