25 | 26 |
Open door. Display should flash. | Press “ACTIVATE CONTROLS” button pad and close |
| door. |
| Note: There is a 6 minute delay before the unit starts. |
Performance Checklist
h Verify cabinet size.
h Verify electrical supply and water supply (if applicable).
h Install
h Position unit in cutout, level at desired height, and secure unit.
h
h Connect water supply (if applicable).
•Verify icemaker fill tube is properly inserted.
•Verify icemaker bailarm is down.
•Verify dispenser operation (if applicable).
h Align/square door(s).
h Verify drain pan is properly installed and there are no leaks in water connection.
h Install kickplate.
h Remove internal packaging and labels and wipe unit down.
Installer’s information:
Installer’s Name:_____________________________
Installer’s Company:_________________________
Date: ________________________________________
49 | 50 |