Hotpoint FZA80, FZA50 manual Levelling, Hinge Covers, Joining

Page 4

Installation

SAFETY &

INSTALLATION

 

 

Levelling:

Level the freezer when it is in its final location by adjusting the front feet, until firm contact is made with the floor. This will stop rocking or vibration and keep the door aligned which helps the freezer run reliably and efficiently.

Note: Before plugging in and switching on, leave the freezer standing in its final location for at least 15 minutes to allow it to settle.

Hinge Covers:

After the front feet have been adjusted and the freezer is level fit the left and right hand bottom hinge covers supplied.

To fit:

Align the bottom hinge cover onto the cover plate slots.

Push until the bottom hinge cover clicks into place.

Joining:

Equal height Hotpoint ‘FUTURE’ fridges and freezers can be joined together to look like one unit by using a Filler Kit available from Hotpoint Genuine Parts & Accessories Mail Order Hotline (see KEY CONTACTS, back page).

4

Image 4 Contents
Step For Your Safety For your safety, read the following adviceWhen installing your freezer When using your freezerLocation & Air Circulation InstallationMinimum space required to open door Hinge Covers LevellingJoining Changing the Plug Changing the Mains LeadControlling the Temperature of the Freezer Compartment ControlsRed High Temperature Warning Light Indicator Lights Green Mains LightAmber Fast Freeze Light Fast Freeze Button Freezing Fresh Food Useful Advice FZA80 and FZM80How Frost Free works Making the best use of your FreezerStoring Food in a Freezer Advice on Using Freezer Drawers Ice TrayCleaning Cleaning InteriorExterior Door SealDoor Reversal Protective material ie. the original packaging Troubleshooting Operating Sounds of a Freezer Hotpoint guarantee Recycling & Disposal InformationAfter Sales Service Repair Service and Information Help DeskAfter Sales Service Repair Service and Information DeskGenuine Parts and Accessories Key Contacts