Model MRC88 | Page: 77 |
Section 6: Completing the Programming Process
After completing the previous 5 Sections, it is finally time to transfer the project to the Controller and start using the system. Besides transferring the project, proper file
TRANSFERRING A PROJECT TO THE MRC88
(BASIC/ADVANCED)
When all programming of the virtual keypad has been completed and all IR commands tested, the project can be transferred to the MRC88.
Proceed as follows:
1.Be sure the MRC88 Controller and the PC are connected via the COM port or USB port on the front of the MRC88, that power is applied to the MRC88, the MRC88 is connected to all sources and Keypads, and the MRC88 is operating properly (see
2.Set the PROTECT switch [Figure
3.Select BASE UNIT TRANSFER (Ctrl+B) from the File menu.
4.A Project Down Load window appears with the statement "Be Sure Dragon is Connected to MRC88…", Click “NEXT”
5.A “Preparing Data for Download …” window appears and then changes into the “Please wait, Downloading” window. A transfer status bar shows transmission of data.
6.When “Download Completed Successfully” appears, click “FINISH”.
7.Remove the programming cable from the front of the unit and set the PROTECT switch to the ON position.
8.MRC88 System should now be fully functional.
(EXPANDED)
1.Connect PC to the COM port (or USB port) on the PRIMARY MRC88 Controller.
2.Set the PROTECT switch [Figure
3.Click Base Unit Transfer (Ctrl+B) from the File menu.
4.A Project Down Load window appears with the statement "Make Sure Dragon is Connected to MRC88 PRIMARY Unit (Zones
5.A “Preparing Data for Download …” window appears and then changes into the “Please wait, Downloading” window. A transfer status bar shows transmission of data.
6.A Project Down Load window appears with the statement "Make Sure Dragon is Connected to MRC88 SECONDARY Unit (Zones
7.A “Preparing Data for Download …” window appears and then changes into the “Please wait, Downloading” window. A transfer status bar shows transmission of data.
8.When “Download Completed Successfully” appears, click “FINISH”.
9.Remove the programming cable from the front of the unit and set the PROTECT switch to the ON position.
10.Connect the EXPANSION ports on the two MRC88 Controllers using the included male to male DB15 cable.
11.Cycle power on both units for changes to take effect.
12.The Expanded MRC88 System should now be fully functional.
UPLOADING MRC88 PROJECTS
Though other versions of Dragon
© 2003 Xantech Corporation