Bloomfield 8792 owner manual ELECTRICIAN’S Installation Instructions

Page 7

INSTALLATION INSTRUCTIONS (continued)

75873 Owners Manual Gourmet 1000 Dual Airpot Brewers

NSF requires that the brewer be able to be moved for cleaning underneath. A flex line or loops of copper tubing will satisfy this requirement. See Figure 2 below.

Fig. 2 Water Supply Installation

In some areas, local codes require a backflow preventer (check valve) to be installed on the inlet water line. If a backflow preventer is used, you must install a water hammer arrester in the incoming line, between the backflow preventer and the brewer inlet, as far away from the brewer as space will allow. This will relieve the excessive back pressures that can cause faucet leaks and solenoid malfunctions.

ELECTRICIAN’S INSTALLATION INSTRUCTIONS

REFER TO ELECTRICAL SPECIFICATIONS - Page 1 Check the nameplate to determine correct electrical service required for the Brewer to be installed.

IMPORTANT: Before connecting to electricity, make sure automatic brewers are connected to the water supply.

Gourmet 1000™ dual brewers must be wired by an electrician. Model 8792 requires a 120/240V 20A circuit (50/60 Hz, L1, L2, Neut. plus Ground).

Remove front panel to gain access to terminal block. Green terminal must be connected to a suitable building ground. Circuit must be capable of 4000 Watts. See figure 3 at right.

NOTE: This equipment must be installed to comply with applicable federal, state and local plumbing codes and ordinances.

WARNING ELECTRIC SHOCK HAZARD:

Brewer must be properly grounded to prevent possible shock hazard. DO NOT assume a plumbing line will provide such a ground. Electrical shock will cause death or serious injury.

IMPORTANT: Do not connect brewer to electrical power until both tanks are filled with water. Pour water into each pour-over opening until water flows from the respective brew head.

IMPORTANT:

Supply power must match nameplate for voltage and phase. Connecting to the wrong voltage will damage the brewer or result in decreased performance. Such damage is not covered by warranty.

625

IMPORTANT: Wiring must be installed in approved solid or flexible conduit, and must be secured to the brewer with a strain relief (to be provided by the installer).

Fig. 3 115/230 Volt Terminal Block

5

Image 7
Contents 625 Shipping Damage Claims Procedure Warranty StatementWire + Ground Table of ContentsSpecifications Model Volts Watts Amps Power Supply RequirementsFeatures & Operating Controls Features and Operating ControlsAgency Listing Information Precautions and General InformationPLUMBER’S Installation Instructions Installation InstructionsLeveling the Unit ELECTRICIAN’S Installation Instructions Installation InstructionsSTART-UP OperationAutomatic Operation POUR-OVER FeatureHOT Water Faucet Right Side Preparation Brewing CoffeePOUR-OVER Operation Cleaning Instructions Procedure Clean Coffee BrewerSymptom Possible Cause Suggested Remedy Troubleshooting SuggestionsServicing Instructions Access PanelsServicing Instructions Temperature AdjustmentReplace Heating Element Timer Adjustment Automatic Brewers onlyRemove Tank LID Assembly Replace ThermostatReplace Solenoid Clean Solenoid ScreenReplace HOT Water Faucet Coil Replace Timer AssemblyRepair HOT Water Faucet Procedure Delime the Water Tank Servicing Instructions Description Used on HOT Water Tank AssemblySolenoid Repair Kits Electrical ComponentsFaucet Repair Kits Plumbing ComponentsCabinet Components Wiring Diagram Page Telephone Fax