Bloomfield 9102A, 9104A ELECTRICIAN’S Installation Instructions, Initial SET-UP Instructions

Page 8

INSTALLATION INSTRUCTIONS (continued)

CAUTION:

Electric Shock

Hazard

Brewer must be properly grounded to a reliable earth ground to prevent possible shock hazard. Do not assume a plumbing line will provide such a ground. Electrical shock may cause serious injury.

ELECTRICIAN’S INSTALLATION INSTRUCTIONS

Refer to Electrical Specifications, page 1.

Brewer requires a dedicated single-phase circuit: Model 9102A 120 Volt AC, 50/60 Hz 1ø 20 Amps

NEMA 5-15R receptacle

Model 9104A 120/240 Volt AC, 50/60 Hz 1ø 30 Amps 3-Wire (L1, L2, Neutral) + Ground

Fig. 4 Model 9104A Terminal Block

IMPORTANT:

Initial set-up must be performed by a qualified installer or qualified service technician. Improper set-up will damage the brewer and void the warranty.

IMPORTANT:

Complete water line installation before connecting brewer to electrical power.

MAKE SURE THE FRONT PANEL "TANK HEATER" SWITCH IS IN THE OFF POSITION BEFORE CONNECTING BREWER TO ELECTRICAL POWER.

DO NOT turn the TANK HEATER switch ON until the water tank is filled. Heating element must be completely submerged in water at all times. Damage to the brewer caused by operating the heating elements dry is NOT covered by warranty.

INITIAL SET-UP INSTRUCTIONS

Plumber’s and Electrician’s installation procedures must be completed before proceeding with the set-up.

Be sure all electrical connections are secure, and that all plumbing connections are secure and leak-proof.

1. CHECK BREWER FOR PROPER CONFIGURATION

Make sure spray disk gasket is in place INSIDE of spray head.

Make sure spray disk is properly installed. Check hot water faucet for proper operation.

2. FILL WATER TANK

Be sure POWER SWITCH and TANK HEATER switch are OFF, then connect brewer to electric power.

Insert an empty brew chamber under the brew head. Place an empty satellite in position. Pour fresh cold water into the POUR-OVER OPENING until water flows from the brew basket.

3.CHECK HEATING

Turn POWER SWITCH ON, then press TANK HEATER switch ON. Water in tank will heat to brewing temperature in approximately 30 minutes. When the water temperature reaches the brew temperature setpoint, the READY-TO- BREW light will glow.

Hold a suitable container under the HOT WATER FAUCET, then open the faucet . Continue drawing water until all trapped air is expelled.

663 76061 Owners Manual for 9102A Single Satellite Brewer

6

Image 8
Contents For WithWarranty Statement Table of Contents SpecificationsFeatures and Operating Controls Brewer Control PanelBrew Chamber SatelliteAgency Approval Information General Information and PrecautionsBurn Hazard Installation Instructions Install LegsPLUMBER’S Installation Instructions Level the UnitELECTRICIAN’S Installation Instructions Initial SET-UP InstructionsOperating Instructions Brewing CoffeeBrew & Bypass HOT Water FaucetProcedure Clean Coffee Brewer Cleaning InstructionsCleaning Instructions Procedure Clean SatelliteTroubleshooting Suggestions Symptom Possible Cause Suggested RemedyAccess Panels Servicing InstructionsTemperature Adjustment Brew Timer Adjustment Bypass Adjustment 9104A only Procedure Delime the Water Tank Chemical Burn HazardServicing Instructions Exploded View Electrical Components Cabinet & Related Components Satellite Assembly 9105SS Service Kits Faucet Repair KitsWiring Diagrams Telephone Fax For orders only

9104A, 9102A specifications

Bloomfield 9104A and 9102A are two latest innovations in the realm of advanced manufacturing equipment, specifically designed for high efficiency and precision in various industrial applications. These models stand out due to their unique features, state-of-the-art technologies, and robust characteristics, making them suitable for both small-scale operations and large industrial setups.

The Bloomfield 9104A is tailored for a wide array of applications, offering improved performance metrics compared to its predecessors. One of its standout features is the enhanced processing speed, which reduces production time significantly. This is largely due to its advanced control system, which integrates real-time data analytics and machine learning algorithms. This enables predictive maintenance, minimizing downtime and ensuring smoother operational flow.

On the other hand, the Bloomfield 9102A is optimized for versatility and user-friendliness. It boasts an intuitive interface that allows operators to adjust settings with ease, enhancing overall productivity. The unit is designed to handle a variety of materials, demonstrating its flexibility in manufacturing processes. Its compact design does not compromise performance, making it ideal for facilities with limited space.

Both models employ cutting-edge technologies that cater to modern manufacturing requirements. The inclusion of IoT connectivity allows for seamless integration into smart factories. This feature enables remote monitoring and control, as well as the capability to gather performance data for further analysis and optimization.

As for characteristics, durability and reliability are key aspects of both models. Built with high-quality materials and components, they are designed to withstand the rigors of continuous operation. Additionally, the energy-efficient designs contribute to lower operational costs and a reduced carbon footprint, fulfilling the growing demand for sustainable manufacturing solutions.

In summary, Bloomfield 9104A and 9102A represent the next generation of manufacturing equipment, equipped with advanced technologies that enhance operational efficiency, versatility, and sustainability. Their unique features and robust designs make them valuable assets for any industrial operation, paving the way for future innovations in the manufacturing sector.