Connection to the gas supply
Ensure that the gas type at the installation site is the same as that stated on the appliance rating plate.
On the end of the shaft, which includes the GJ 1/2” threaded elbow, adjustment is fixed so that the washer is fitted between the components as shown in the diagram. Screw the parts together without using excessive force.
| A |
| B |
| C |
A) End of gas shaft with nut | |
B) | Washer |
C) | Elbow |
Connection
Connection to the gas supply should be with either rigid or
The connection should be suitable for connecting to RC 1/2 (1/2 BSP male thread). When the final connection has been made, it is essential that a thorough leak test is carried out on the hob and installation using leak detection fluid.
Ensure that the main connection pipe does not exert any stain on the hob.
It is important to install the elbow correctly, with the shoulder on the end of the thread, fitted to the hob connecting pipe.
Failure to ensure the correct assembly will cause leakage of gas.
14