ATP
4.0ACCEPTANCE TEST PROCEDURE
4.1Preliminary Information
This test procedure is intended to serve as the final proof of performance document for the 7122B/7133B ACU, subsequent to field installation and
4.2.1 Maintenance Mode
1.On the 7122B/7133B OU set the MAIN POWER circuit
breaker to ON. | _______(Check) |
2.Verify that the EMERGENCY STOP button is in the out
| position. | _______(Check) |
3. | Set the MAINT/REMOTE switch to MAINT. | _______(Check) |
4.Using the EL UP/DOWN switch, drive the antenna and
verify correct directional movement of the antenna. | _______(Check) |
5.Using the EL UP/DOWN switch, drive the antenna UP and verify that the limit switch stops the movement of
the antenna. | _______(Check) |
6.Using the EL UP/DOWN switch, drive the antenna DOWN and verify that the limit switch stops the movement of the
antenna. | _______(Check) |
7.Using the AZ CW/CCW switch, drive the antenna and
verify correct directional movement of the antenna. | _______(Check) |
8.Using the AZ CW/CCW switch, drive the antenna CW and verify that the limit switch stops the movement of
the antenna. | _______(Check) |
9.Using the AZ CW/CCW switch, drive the antenna CCW and verify that the limit switch stops the movement of
the antenna. | _______(Check) |