Bunn TWIN service manual Service ON/OFF Switches Model CEZ

Page 26

SERVICE (cont.)

ON/OFF SWITCHES - Model CEZ

 

 

 

 

R

 

 

 

T-SID

E-REA

 

 

FRON

 

 

 

 

 

 

 

RT

 

 

 

 

STA

 

 

 

 

WER

 

 

 

 

ON/LO

 

 

 

 

R

 

 

 

 

E-REA

 

 

 

 

T-

 

 

 

 

FRON

 

 

 

E

RT

 

 

 

 

STA

 

 

 

 

WER

 

 

 

 

ON/LO

 

 

 

N

 

 

 

NE

 

 

 

 

FUN ARE

URE

 

 

 

FAIL

 

 

 

 

 

 

 

FIG. 5 ON/OFF SWITCHES

 

P1876

 

 

If continuity is present as described, reconnect the black wire to the center terminal and the remaining wire to the lower terminal.

If continuity is not present as described, replace the switch.

Removal and Replacement:

1.If switch to be removed is in the left control panel and brewer is equipped with a faucet, turn off water supply and remove faucet.

2.Remove front end cap

3.Remove the wires from the switch terminals.

4.Compress the clips inside the hood and gently push the switch through the opening.

5.Push the new switch into the opening and spread the clips to hold switch in the hood.

6.Refer to FIG. 6 when reconnecting the wires.

7.Replace front end cap and faucet (if removed).

Location:

The ON/OFF switches are located on the front of

 

 

 

 

 

 

 

 

the hood.

 

 

WHI to Terminal Block (White

 

 

 

Insert on 120V or 120/240V

Test Procedure:

 

 

Models)

1. Disconnect the brewer from the power source.

 

 

RED to Terminal Block (Red

 

 

Insert on 200V or 230V

2. Viewing the switch from the back remove the white

 

 

 

 

Models)

wire from the upper terminal and the black wire

 

 

BLK to Terminal Block (Black

from the center terminal.

 

 

3. With a voltmeter, check the voltage across the

 

 

Insert)

white wire and the black wire. Connect the brewer

 

 

Terminal #1 (See chart below)

to the power source. The indication must be 120

 

 

 

 

 

 

volts ac.

 

 

 

P1918

4. Disconnect the brewer from the power source.

Connect wire to Terminal #1 as follows:

 

If voltage is present as described, reconnect the white

Brew Station Warmers

 

WHI/RED

wire and proceed to #5.

............................................

 

 

 

 

If voltage is not present as described, refer to the

Side Warmers

 

 

Wiring Diagrams and check the brewer wiring har-

(Front)

BRN/BLK

ness.

(Rear)

VIO

 

FIG. 6 ON/OFF SWITCH WIRING

 

 

 

 

 

 

 

5. With the black wire removed, remove the wire from the lower terminal.

6. Check for continuity across the center and lower terminal with the switch in the "ON" position. Continuity must not be present when the switch is in the "OFF" position.

Page 26

29319 091203

 

Image 26
Contents CEZ Cdbc Twin Contents IntroductionUser Notices Electrical Hook-Up Electrical RequirementsPlumbing Requirements Additional Warmer Switches ON/OFF SwitchBrew Switch Ready IndicatorCoffee Brewing CleaningInitial SET-UP CEZ Adjustments & Optional Settings Displaying Brew Temperature Cdbc Adjustments & Optional SettingsSetting Brew Temperature Setting Brew LockoutAdjusting Brew Volumes Pulse Brew Setup Procedure Cdbc Twin & Cdbcf Twin Troubleshooting Before troubleshooting this brewer, check for the followingProbable Cause TroubleshootingRefill Circuit Problem RemedyProblem Probable Cause Remedy Heating Circuit Problem Probable Cause Remedy Ings are taken 4b. Temperature Probe CEZ Remove the probe from3 of the J5 connector. At Control boardSet the temperature to 200F 4 of the J3 connector. At2b. Temperature Probe CEZ Remove the probe from Bilize. If temperature in tank isBrewing Circuit Problem Brew cycle will not startTroubleshooting Brewing Circuit Probable Cause Remedy Switch Move the two wires. Check forSupply and check wiring Holes are clear and unobDiagnostics Cause Things to CheckContents ServiceComponent Access Service PC Control Board Model Cdbc Disconnect the 11-pin connector from the control panelService PC Control Board Model CEZ Control Boards CEZService Switch Panel Model Cdbc Switch Panels CdbcService ON/OFF Switches Model CEZ Minals when the switch is released Service Brew Switch Start Model CEZBottom switch terminal Service Dispense ValveLimit Thermostat Limit ThermostatsTank Heaters Tank HeaterService Tank Heaters Tank Heater WiringRefill Valve Check for continuity across the refill valve coil terminalsWarmer Elements Warmer ElementsSchematic Wiring Diagram CEZ Twin 0/6 Left Schematic Diagramwiring Twincdbc Schematic Wiring Diagram Cdbc Twin 2/2 Right
Related manuals
Manual 39 pages 50.34 Kb

TWIN specifications

The Bunn TWIN,ITB is a remarkable coffee brewing system designed for commercial use, aimed at establishments that require a high volume of coffee while maintaining superior quality. This innovative brewer stands out through its dual brewing capability, allowing users to brew two different types of coffee simultaneously. This feature is particularly beneficial for cafes, restaurants, and other food service locations where diverse customer preferences must be met efficiently.

One of the main features of the Bunn TWIN,ITB is its advanced brewing technology. The system utilizes Bunn's patented brewing process, ensuring optimal coffee extraction and flavor profile every time. It employs a digitally controlled brew timer and state-of-the-art heating elements, providing precise temperature control essential for achieving the ideal brew. This technology allows for consistent results, ensuring that each cup meets the high standards expected in a commercial setting.

The design of the TWIN,ITB is user-friendly and intuitive. It includes an easy-to-read LED display that simplifies programming and monitoring of the brewing process. This streamlined interface enables baristas to adjust settings quickly and efficiently, significantly reducing wait times for customers. Additionally, the unit's low-profile design enables it to fit seamlessly into various kitchen layouts and countertops, optimizing valuable space.

Durability and reliability are at the forefront of the Bunn TWIN,ITB's construction. Built with high-quality materials, the brewer is designed to withstand the rigors of intense daily use. Its stainless-steel finish not only provides a sleek and professional appearance but also makes it easy to clean and maintain, ensuring longevity and excellent performance throughout its lifespan.

Furthermore, the TWIN,ITB features an impressive water capacity with a built-in hot water tank. This allows users to brew large batches of coffee without interruption and offers instant hot water for tea, soups, or other hot beverages. The efficient brewing system utilizes pre-infusion technology, which saturates the coffee grounds before extraction, enhancing the overall flavor and aroma of the brewed coffee.

In summary, the Bunn TWIN,ITB is an exceptional choice for any commercial establishment looking to provide high-quality coffee efficiently. Its dual brewing capabilities, advanced technologies, user-friendly design, durability, and additional features make it a valuable addition to any coffee service operation. Whether busy mornings or afternoon rushes, this brewer ensures that every cup of coffee meets the high standards of taste and quality that customers expect.