Bunn TWIN service manual Refill Valve, Check for continuity across the refill valve coil terminals

Page 32

SERVICE (cont.)

REFILL VALVE

J3

J4

J6

P1874

FIG. 15 REFILL VALVE

Location:

The refill valves are located inside the trunk on the lower center part of the component brackets.

Test Procedures:

1.Disconnect the brewer from the power source.

2.Disconnect the white and white/blue wires from the refill valve. Set the "ON/OFF" switch in the "ON" upper position.

3.With a voltmeter, check the voltage across the coil wires. Connect the brewer to the power source. The indication must be 120 volts ac.

4.Disconnect the brewer from the power source.

If voltage is present as described, proceed to #5.

If voltage is not present as described, refer to Wiring Diagrams and check brewer wiring harness.

5.Check for continuity across the refill valve coil terminals.

If continuity is present as described, reconnect the white and white/blue wires from the circuit board.

If continuity is not present as described, replace the refill valve.

6.Check the refill valve for coil action. Connect the brewer to the power source. With "ON/OFF" switch in the "ON' upper position press start switch and listen carefully in the vicinity of the refill valve for a" clicking" sound as the coil magnet attracts.

7.Disconnect the brewer from the power source.

If the sound is heard as described and water will not pass through the refill valve, there may be a blockage in the water line before the refill valve or, the solenoid valve may require inspection for wear, and removal of waterborne particles.

If the sound is not heard as described, replace the refill valve.

Removal and Replacement:

1.Remove both wires from the refill valve.

2.Turn off the water supply to the brewer.

3.Disconnect the water lines to and from the refill valve.

4.Remove the two 1/4"-20 screws securing the refill valve mounting bracket to the component bracket. Remove bracket and valve as an assembly.

5.Using two 1/4"-20 screws install the new refill valve and bracket to the component bracket.

6.Securely fasten the water lines to and from the valve.

7.Refer to FIG. 16 when reconnecting the wires.

WHI from Terminal

Block

WHI/BLU from

Control Board

P1858

FIG. 16 REFILL VALVE WIRING

Page 32

29319 091203

 

Image 32
Contents CEZ Cdbc Twin Contents IntroductionUser Notices Electrical Hook-Up Electrical RequirementsPlumbing Requirements ON/OFF Switch Brew SwitchAdditional Warmer Switches Ready IndicatorCoffee Brewing CleaningInitial SET-UP CEZ Adjustments & Optional Settings Cdbc Adjustments & Optional Settings Setting Brew TemperatureDisplaying Brew Temperature Setting Brew LockoutAdjusting Brew Volumes Pulse Brew Setup Procedure Cdbc Twin & Cdbcf Twin Troubleshooting Before troubleshooting this brewer, check for the followingTroubleshooting Refill Circuit ProblemProbable Cause RemedyProblem Probable Cause Remedy Heating Circuit Problem Probable Cause Remedy 4b. Temperature Probe CEZ Remove the probe from 3 of the J5 connector. AtIngs are taken Control board4 of the J3 connector. At 2b. Temperature Probe CEZ Remove the probe fromSet the temperature to 200F Bilize. If temperature in tank isBrewing Circuit Problem Brew cycle will not startTroubleshooting Brewing Circuit Probable Cause Remedy Move the two wires. Check for Supply and check wiringSwitch Holes are clear and unobDiagnostics Cause Things to CheckContents ServiceComponent Access Service PC Control Board Model Cdbc Disconnect the 11-pin connector from the control panelService PC Control Board Model CEZ Control Boards CEZService Switch Panel Model Cdbc Switch Panels CdbcService ON/OFF Switches Model CEZ Minals when the switch is released Service Brew Switch Start Model CEZBottom switch terminal Service Dispense ValveLimit Thermostat Limit ThermostatsTank Heaters Tank HeaterService Tank Heaters Tank Heater WiringRefill Valve Check for continuity across the refill valve coil terminalsWarmer Elements Warmer ElementsSchematic Wiring Diagram CEZ Twin 0/6 Left Schematic Diagramwiring Twincdbc Schematic Wiring Diagram Cdbc Twin 2/2 Right
Related manuals
Manual 39 pages 50.34 Kb

TWIN specifications

The Bunn TWIN,ITB is a remarkable coffee brewing system designed for commercial use, aimed at establishments that require a high volume of coffee while maintaining superior quality. This innovative brewer stands out through its dual brewing capability, allowing users to brew two different types of coffee simultaneously. This feature is particularly beneficial for cafes, restaurants, and other food service locations where diverse customer preferences must be met efficiently.

One of the main features of the Bunn TWIN,ITB is its advanced brewing technology. The system utilizes Bunn's patented brewing process, ensuring optimal coffee extraction and flavor profile every time. It employs a digitally controlled brew timer and state-of-the-art heating elements, providing precise temperature control essential for achieving the ideal brew. This technology allows for consistent results, ensuring that each cup meets the high standards expected in a commercial setting.

The design of the TWIN,ITB is user-friendly and intuitive. It includes an easy-to-read LED display that simplifies programming and monitoring of the brewing process. This streamlined interface enables baristas to adjust settings quickly and efficiently, significantly reducing wait times for customers. Additionally, the unit's low-profile design enables it to fit seamlessly into various kitchen layouts and countertops, optimizing valuable space.

Durability and reliability are at the forefront of the Bunn TWIN,ITB's construction. Built with high-quality materials, the brewer is designed to withstand the rigors of intense daily use. Its stainless-steel finish not only provides a sleek and professional appearance but also makes it easy to clean and maintain, ensuring longevity and excellent performance throughout its lifespan.

Furthermore, the TWIN,ITB features an impressive water capacity with a built-in hot water tank. This allows users to brew large batches of coffee without interruption and offers instant hot water for tea, soups, or other hot beverages. The efficient brewing system utilizes pre-infusion technology, which saturates the coffee grounds before extraction, enhancing the overall flavor and aroma of the brewed coffee.

In summary, the Bunn TWIN,ITB is an exceptional choice for any commercial establishment looking to provide high-quality coffee efficiently. Its dual brewing capabilities, advanced technologies, user-friendly design, durability, and additional features make it a valuable addition to any coffee service operation. Whether busy mornings or afternoon rushes, this brewer ensures that every cup of coffee meets the high standards of taste and quality that customers expect.