Bunn TWIN service manual Electrical Requirements, Plumbing Requirements, Electrical Hook-Up

Page 4

ELECTRICAL REQUIREMENTS

CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.

L2 RED

120V.A.C.

WHITE

208 or 240V.A.C.

NEUTRAL

120V.A.C.

L1 BLACK

One circuit models require one 3-wire, grounded service rated 120/208 or 120/240 volts ac, 40 amp, single phase, 60 Hz.

Two circuit models require two 3-wire, grounded service rated 120/208 or 120/240 volts ac, 20 amp, single phase, 60 Hz.

Proceed as follows:

Electrical Hook-Up

CAUTION Ð Improper electrical installation will damage electronic components.

1.An electrician must provide electrical service as specified.

2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3.Remove the front panel beneath the sprayhead.

4.Feed the cord through the strain relief and connect it to the terminal block.

5.Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Replace the front panel.

6.If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing has been hooked up, the brewer is ready for Initial Set-Up.

PLUMBING REQUIREMENTS

These brewers must be connected to a cold water system with operating pressure between 5 and 90 psi (34.5 and 620 kPa) for CDBC models and 20 and 90 psi (138 and 620 kPa) for CEZ models from a 1Ú2" or larger supply line. A shut-off valve should be installed in the line before the brewer. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 3Ú8" flare. Bunn-O-Matic does not recommend the use of a reverse-osmosis or deionized water supply to this equipment.

NOTE - Bunn-O-Matic recommends 3Ú8" copper tubing from a 1Ú2" or larger water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

This equipment must be installed to comply with the Basic Plumbing Code of the

Building Officials and Code Administrators International, Inc. (BOCA)

and the Food Service Sanitation Manual of the Food and Drug Administration (FDA).

Plumbing Hook-Up

1.Flush the water line.

2.Securely attach it to the flare fitting at the rear of the brewer.

3.Turn on the water supply.

Page 4

29319 091203

 

Image 4
Contents CEZ Cdbc Twin Contents IntroductionUser Notices Plumbing Requirements Electrical RequirementsElectrical Hook-Up ON/OFF Switch Brew SwitchAdditional Warmer Switches Ready IndicatorInitial SET-UP CleaningCoffee Brewing CEZ Adjustments & Optional Settings Cdbc Adjustments & Optional Settings Setting Brew TemperatureDisplaying Brew Temperature Setting Brew LockoutAdjusting Brew Volumes Pulse Brew Setup Procedure Cdbc Twin & Cdbcf Twin Troubleshooting Before troubleshooting this brewer, check for the followingTroubleshooting Refill Circuit ProblemProbable Cause RemedyProblem Probable Cause Remedy Heating Circuit Problem Probable Cause Remedy 4b. Temperature Probe CEZ Remove the probe from 3 of the J5 connector. AtIngs are taken Control board4 of the J3 connector. At 2b. Temperature Probe CEZ Remove the probe fromSet the temperature to 200F Bilize. If temperature in tank isBrewing Circuit Problem Brew cycle will not startTroubleshooting Brewing Circuit Probable Cause Remedy Move the two wires. Check for Supply and check wiringSwitch Holes are clear and unobDiagnostics Cause Things to CheckComponent Access ServiceContents Service PC Control Board Model Cdbc Disconnect the 11-pin connector from the control panelService PC Control Board Model CEZ Control Boards CEZService Switch Panel Model Cdbc Switch Panels CdbcService ON/OFF Switches Model CEZ Bottom switch terminal Service Brew Switch Start Model CEZMinals when the switch is released Service Dispense ValveLimit Thermostat Limit ThermostatsTank Heaters Tank HeaterService Tank Heaters Tank Heater WiringRefill Valve Check for continuity across the refill valve coil terminalsWarmer Elements Warmer ElementsSchematic Wiring Diagram CEZ Twin 0/6 Left Schematic Diagramwiring Twincdbc Schematic Wiring Diagram Cdbc Twin 2/2 Right
Related manuals
Manual 39 pages 50.34 Kb

TWIN specifications

The Bunn TWIN,ITB is a remarkable coffee brewing system designed for commercial use, aimed at establishments that require a high volume of coffee while maintaining superior quality. This innovative brewer stands out through its dual brewing capability, allowing users to brew two different types of coffee simultaneously. This feature is particularly beneficial for cafes, restaurants, and other food service locations where diverse customer preferences must be met efficiently.

One of the main features of the Bunn TWIN,ITB is its advanced brewing technology. The system utilizes Bunn's patented brewing process, ensuring optimal coffee extraction and flavor profile every time. It employs a digitally controlled brew timer and state-of-the-art heating elements, providing precise temperature control essential for achieving the ideal brew. This technology allows for consistent results, ensuring that each cup meets the high standards expected in a commercial setting.

The design of the TWIN,ITB is user-friendly and intuitive. It includes an easy-to-read LED display that simplifies programming and monitoring of the brewing process. This streamlined interface enables baristas to adjust settings quickly and efficiently, significantly reducing wait times for customers. Additionally, the unit's low-profile design enables it to fit seamlessly into various kitchen layouts and countertops, optimizing valuable space.

Durability and reliability are at the forefront of the Bunn TWIN,ITB's construction. Built with high-quality materials, the brewer is designed to withstand the rigors of intense daily use. Its stainless-steel finish not only provides a sleek and professional appearance but also makes it easy to clean and maintain, ensuring longevity and excellent performance throughout its lifespan.

Furthermore, the TWIN,ITB features an impressive water capacity with a built-in hot water tank. This allows users to brew large batches of coffee without interruption and offers instant hot water for tea, soups, or other hot beverages. The efficient brewing system utilizes pre-infusion technology, which saturates the coffee grounds before extraction, enhancing the overall flavor and aroma of the brewed coffee.

In summary, the Bunn TWIN,ITB is an exceptional choice for any commercial establishment looking to provide high-quality coffee efficiently. Its dual brewing capabilities, advanced technologies, user-friendly design, durability, and additional features make it a valuable addition to any coffee service operation. Whether busy mornings or afternoon rushes, this brewer ensures that every cup of coffee meets the high standards of taste and quality that customers expect.