Bunn FMD-1 FMD-2 service manual Level Control Board and Level Probe FMD-1 only

Page 31

SERVICE (cont.)

LEVEL CONTROL BOARD AND LEVEL PROBE - FMD-1 ONLY (cont.)

Test Procedure:

1.Disconnect the dispenser from the power source.

2.Remove the violet wire from terminal 1 & pink wire from terminal 4 of the circuit board.

3.Check the voltage across terminals 2 & 3 with a voltmeter. Connect the dispenser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models.

4.Disconnect the dispenser from the power source.

If voltage is present as described, proceed to #5. If voltage is not present as described, refer to the wiring diagram and check the dispenser wiring haness.

5.Reconnect the violet wire to terminal 1.

6.Carefully connect a piece of insulated jumper wire to terminal 4. Keep the other end of this wire away from any metal surface of the dispenser.

7.Check the voltage across terminals 1 & 3 with a voltmeter. Connect the dispenser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models after a delay of approximately 5 seconds.

8.Touch the free end of jumper wire to the compo- nent bracket. The indication must be 0.

9.Move the jumper wire away from the component bracket. The indication must again be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models , three wire 120/240 volt models after a delay of approximately 5 seconds.

10.Disconnect the dispenser from the power source and remove the jumper wire from terminal 4.

If voltage is present as described, the level control board is operating properly, proceed to #11.

If voltage is not present as described, replace the level control board.

11.Reconnect the pink wire to terminal 4.

12.Gently pull the probe out of the tank lid and inspect for corrosion. Replace it if necessary.

13.Place the probe so that neither end is in contact with any metal surface of the dispenser.

14.Check the voltage across terminals 1 & 3 with a voltmeter. Connect the dispenser to the power source. The indication must be 120 volts ac for two wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models after a delay of approximately 5 seconds.

15.Move the probe's flat end to the tank. The indica- tion must be 0.

16.Move the probe's flat end away from the tank. The indication should again be 120 volts ac for two

wire 120 volt models, three wire 120/208 volt models, three wire 120/240 volt models after a delay of approximately 5 seconds.

If voltage is present as described, reinstall the probe, the level control board and level probe are operating properly.

If voltage is not present as described, check the pink probe wire for continuity.

Removal and Replacement:

1.Remove all wires from the level control board.

2.Remove two #8-32 keps nuts holding level control board to right side of the component bracket.

3.Remove level control board and spacers.

4.Install the new level control board and spacers to the right side of the component bracket using two #8-32 keps nuts.

5.Refer to Fig. 27 when reconnecting the wires.

TI VIO to Inlet Solenoid Coil

T2 BLK to Main Harness

T3 WHI to Main Harness

T4 PNK to Probe

P1671

FIG. 27 LEVEL BOARD TERMINALS

31

29112 101598

 

Image 31
Contents FMD-1 FMD-2 FMD-1 FMD-2 WarrantyIntroduction User NoticesFMD-1 only 00656.000028368.0001 Plumbing Requirements Initial SET-UPElectrical Requirements Electrical HOOK-UPRunning a Rinse Sequence Rinse Timer FMD-2 onlyInitial Fill & Heat Liquid Level ControlCold Beverage SET-UP Optional FMD-2 only CleaningAdjustments Hopper Motor Speed Adjustment FMD-1Draining the HOT Water Tank Hopper Motor Speed Programing FMD-2Probable Cause TroubleshootingProblem Product will not dispenseProbable Cause Remedy Problem Probable Cause Problem Probable Cause Remedy Dispenser is making unusual Refer to Service Lamp, see page 29 for lamp replacementAuger Drive Components FMD-1 ServiceComponent Access ContentsRetainer Clip Ing panel Retainer Clip Hopper AssemblyHopper Lid Spacer Auger Motor Hopper Base Dust Seal WasherTo the rear of the auger motor mounting panel Auger Drive Components FMD-1Auger Drive Components FMD-2 Hopper Hopper Assy Bushing Panel Auger Drive Shaft Auger Drive Components FMD-2Hopper Dust Seal Remove dust seal 17 from auger motor Disconnect the wires from the auger motor 16 to be removedRemove auger motor and discard Location Ballast FMD-1 & FMD-2Thermostat Terminals Control Board FMD-2 onlyService Dispense Switch Dispense Switchs FMD-1 & FMD-2 FAN FMD-1 & FMD-2 Dispense Switch Terminals P1449FMD-2 Whipper Motor Terminals P1221 Frother and Whipper Motor FMD-1 shown & FMD-2Hopper Drive Board Hopper Drive Board FMD-1 onlyHopper Drive Board Terminals Hopper Drive Board FMD-1 onlyDoor Assy Upper Panel Lamp Holders Lower Panel Lamp Replacement Refer to FigLevel Control Board and Level Probe FMD-1 only Lamp Replacement Refer toAs assembly Lamp Starter and Socket Refer to LocationLevel Control Board and Level Probe FMD-1 only Reconnect the violet wire to terminalLocation RINSE/RUN Switch FMD-1WHI/RED to RINSE/RUN Switch FMD-2BLK from Main Harness WHI/BRN to YEL to Control Board J2-3 Cold Water Solenoid Valve Solenoid Valve Cold Water OPTIONALFMD-2 onlyFMD-1 Solenoid Valve Dispense FMD-1 & FMD-2 Tank Heater Solenoid Valve Inlet FMD-1 & FMD-2Tank Heater FMD-1 shown & FMD-2 Tank Heater Switch FMD-1 shown & FMD-2Main Harness Thermostat WHI/GRN T7 WHI/BLK T12 Transformer FMD-2 onlyBLU WHI Schematic Wiring Diagram FMD-1Schematic Wiring Diagram FMD-2

FMD-1 FMD-2 specifications

The Bunn FMD-1 and FMD-2 models represent a significant advancement in the realm of coffee brewing equipment, catering to the demands of both commercial establishments and serious coffee enthusiasts. These machines are designed to efficiently brew high-quality coffee while minimizing operational complexity.

The Bunn FMD-1 is a single brewer, while the FMD-2 features dual brewing capabilities. This distinction allows the FMD-2 to meet higher coffee volume demands, making it an ideal choice for bustling cafes or restaurants where efficiency is paramount. Both models are engineered with a robust stainless steel construction, ensuring durability and longevity in high-traffic environments.

One standout feature of both models is the infusion technology. This proprietary system enhances the extraction process, allowing for optimal flavor development. The machines utilize a programmable brewing timeline, which provides users with a high level of control over the brewing variables such as time and temperature. This leads to a customizable brewing experience tailored to specific coffee blends or personal taste preferences.

Additionally, these brewers are equipped with an integrated hot water faucet, offering convenience for making tea, hot chocolate, or even instant soup. This multifunctionality improves workflow in busy kitchens, as it eliminates the need for separate hot water dispensers.

The FMD series is also designed with user-friendly interfaces. The digital display provides clear, intuitive information about the brewing process, including brew progress and maintenance alerts. This makes it easy for operators to monitor and manage the machine, ensuring consistency and quality in every cup.

Moreover, both models are designed for quick and efficient cleaning. The removable brewing components facilitate maintenance, which is crucial in a commercial setting where hygiene and equipment uptime are critical.

In terms of capacity, the FMD-1 brews up to 3.8 gallons per hour, while the FMD-2 can produce an impressive 7.5 gallons per hour, demonstrating their suitability for high-volume service.

Overall, the Bunn FMD-1 and FMD-2 models embody the perfect blend of technology, efficiency, and user-centric design, making them a valuable addition to any coffee service operation. Their ability to deliver consistent, high-quality coffee with ease is sure to enhance the customer experience and streamline operations simultaneously.