Bunn FMD-1 FMD-2 Initial SET-UP, Electrical Requirements, Electrical HOOK-UP, Plumbing HOOK-UP

Page 4

INITIAL SET-UP

1.Locate the drip tray assembly beneath the dispenser nested in the packing material.

2.Remove the drip tray and the drip tray cover and set them aside.

3.Remove the water strainer assembly from the drip tray and set it aside.

4.Remove the four legs from the packaging material, apply non-skid pads to the bottom of the legs and securely install the legs in the dispenser base.

ELECTRICAL REQUIREMENTS

CAUTION - The dispenser must be disconnected from the power source until specified in Initial Set-Up.

The 120 volt version of this dispenser has an attached cordset and requires 2-wire, grounded service rated 120 volts ac, 15 amp, single phase, 60 Hz. The mating connector must be a NEMA 5-15R.

The 120/208 and the 120/240 versions of this dispenser has an attched cordset. The mating connector must be a NEMA 14-20R.

(Refer to the dispenser’s dataplate for exact voltage requirement.)

ELECTRICAL HOOK-UP

CAUTION – Improper electrical installation will damage electronic components.

1.An electrician must provide electrical service as specified.

2.Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.

3.Open the front door of the dispenser and place the heater switch in the “OFF” (upper position).

4.Connect the dispenser to the power source.

5.If plumbing is to be hooked-up later be sure the dispenser is disconnected from the power source. If plumbing has been hooked-up, the dispenser is ready for Initial Fill & Heat.

PLUMBING REQUIREMENTS

This dispenser must be connected to a COLD WATER system with operating pressure between 20 and 90 psi (138 and 620 kPa) from a 12" or larger supply line. A shut-off valve should be installed in the line before the dispenser. Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (345 kPa). The water inlet fitting is 14" flare.

NOTE - Bunn-O-Matic recommends 14" copper tubing for installations of less than 25 feet and 38" for more than 25 feet from the 12" water supply line. At least 18 inches of an FDA approved flexible beverage tubing, such as reinforced braided polyethylene or silicone, before the brewer will facilitate movement to clean the countertop. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The size and shape of the hole made in the supply line by this type of device may restrict water flow.

This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanita- tion Manual of the Food and Drug Administration (FDA). For models installed outside the U.S.A., you must comply to the applicable Plumbing/Sanitation Code for your area.

PLUMBING HOOK-UP

1.Securely attach the short piece of tubing on the water strainer assembly to the inlet fitting on the bottom of the dispenser.

2.Flush the water line and securely attach it to the flare fitting on the water strainer assembly.

3.Turn-on the water supply.

4

29112 011906

 

Image 4
Contents FMD-1 FMD-2 Warranty IntroductionUser Notices FMD-1 FMD-2FMD-1 only 00656.000028368.0001 Initial SET-UP Electrical RequirementsElectrical HOOK-UP Plumbing RequirementsRinse Timer FMD-2 only Initial Fill & HeatLiquid Level Control Running a Rinse SequenceCleaning AdjustmentsHopper Motor Speed Adjustment FMD-1 Cold Beverage SET-UP Optional FMD-2 onlyHopper Motor Speed Programing FMD-2 Draining the HOT Water TankTroubleshooting ProblemProduct will not dispense Probable CauseProbable Cause Remedy Problem Probable Cause Problem Probable Cause Remedy Refer to Service Lamp, see page 29 for lamp replacement Dispenser is making unusualService Component AccessContents Auger Drive Components FMD-1Retainer Clip Hopper Assembly Hopper LidSpacer Auger Motor Hopper Base Dust Seal Washer Retainer Clip Ing panelTo the rear of the auger motor mounting panel Auger Drive Components FMD-1Auger Drive Components FMD-2 Hopper Hopper Assy Bushing Panel Auger Drive Shaft Auger Drive Components FMD-2Hopper Dust Seal Remove dust seal 17 from auger motor Disconnect the wires from the auger motor 16 to be removedRemove auger motor and discard Ballast FMD-1 & FMD-2 LocationControl Board FMD-2 only Thermostat TerminalsService Dispense Switch Dispense Switchs FMD-1 & FMD-2 Dispense Switch Terminals P1449 FAN FMD-1 & FMD-2FMD-2 Frother and Whipper Motor FMD-1 shown & FMD-2 Whipper Motor Terminals P1221Hopper Drive Board FMD-1 only Hopper Drive BoardHopper Drive Board FMD-1 only Hopper Drive Board TerminalsLamp Replacement Refer to Fig Door Assy Upper Panel Lamp Holders Lower PanelLamp Replacement Refer to As assemblyLamp Starter and Socket Refer to Location Level Control Board and Level Probe FMD-1 onlyReconnect the violet wire to terminal Level Control Board and Level Probe FMD-1 onlyRINSE/RUN Switch FMD-1 LocationWHI/RED to RINSE/RUN Switch FMD-2BLK from Main Harness WHI/BRN to YEL to Control Board J2-3 Solenoid Valve Cold Water OPTIONALFMD-2 only Cold Water Solenoid ValveFMD-1 Solenoid Valve Dispense FMD-1 & FMD-2 Solenoid Valve Inlet FMD-1 & FMD-2 Tank HeaterTank Heater FMD-1 shown & FMD-2 Tank Heater Switch FMD-1 shown & FMD-2Main Harness Thermostat Transformer FMD-2 only WHI/GRN T7 WHI/BLK T12Schematic Wiring Diagram FMD-1 BLU WHISchematic Wiring Diagram FMD-2

FMD-1 FMD-2 specifications

The Bunn FMD-1 and FMD-2 models represent a significant advancement in the realm of coffee brewing equipment, catering to the demands of both commercial establishments and serious coffee enthusiasts. These machines are designed to efficiently brew high-quality coffee while minimizing operational complexity.

The Bunn FMD-1 is a single brewer, while the FMD-2 features dual brewing capabilities. This distinction allows the FMD-2 to meet higher coffee volume demands, making it an ideal choice for bustling cafes or restaurants where efficiency is paramount. Both models are engineered with a robust stainless steel construction, ensuring durability and longevity in high-traffic environments.

One standout feature of both models is the infusion technology. This proprietary system enhances the extraction process, allowing for optimal flavor development. The machines utilize a programmable brewing timeline, which provides users with a high level of control over the brewing variables such as time and temperature. This leads to a customizable brewing experience tailored to specific coffee blends or personal taste preferences.

Additionally, these brewers are equipped with an integrated hot water faucet, offering convenience for making tea, hot chocolate, or even instant soup. This multifunctionality improves workflow in busy kitchens, as it eliminates the need for separate hot water dispensers.

The FMD series is also designed with user-friendly interfaces. The digital display provides clear, intuitive information about the brewing process, including brew progress and maintenance alerts. This makes it easy for operators to monitor and manage the machine, ensuring consistency and quality in every cup.

Moreover, both models are designed for quick and efficient cleaning. The removable brewing components facilitate maintenance, which is crucial in a commercial setting where hygiene and equipment uptime are critical.

In terms of capacity, the FMD-1 brews up to 3.8 gallons per hour, while the FMD-2 can produce an impressive 7.5 gallons per hour, demonstrating their suitability for high-volume service.

Overall, the Bunn FMD-1 and FMD-2 models embody the perfect blend of technology, efficiency, and user-centric design, making them a valuable addition to any coffee service operation. Their ability to deliver consistent, high-quality coffee with ease is sure to enhance the customer experience and streamline operations simultaneously.