Grindmaster CC-302-20 Installation, Water Inlet Connection, Start-up Procedure for Standard Units

Page 4

Installation

Water Inlet Connection

The following is required for water hook-up:

1.A quick disconnect water connection or enough coiled tubing so the machine can be moved for cleaning underneath. (required for NSF approved water hook-up)

2.A 1/4" male flare adapter is provided (packed inside the drain tray) to be attached by the installer to the back of the machine for hook-up to water supply.

3.Installation to a water filter system is required to prevent lime and scale build up in the machine.

4.Water pipe connections and fixtures directly connected to potable water supply shall be sized, installed, and maintained in accordance with Federal, State, and Local codes. (required for NSF approved water hook-up)

5.Equipment is to be installed with adequate backflow protection to comply with applicable Federal, State, and local codes. (required for NSF approved water hook-up)

Start-up Procedure for Standard Units

NOTE: NSF requires installation of 4” legs for PIC 2,3,4,5,6.

1.Install drip tray in front of machine.

2.Connect the 1/4" male flare fitting to the inlet valve on the back of the machine.

3.Flush the water line to purge any debris from the supply line.

4.Connect a 1/4" water line to the 1/4" male flare connection and turn the water supply on.

a.Minimum water pressure to the machine: 20 psi

b.Maximum water pressure to the machine: 100 psi

5.Plug the power cord into a proper electrical outlet.

6.Turn the power switch to the “ON” position and allow the water tank to fill. The machine will make a subtle hissing sound when this occurs. Allow 3-4 minutes (5 minutes for PIC 5 or PIC 6) for fill time depending on inlet water pressure.

NOTE: If water supply is allowed to run dry, watchdog timer circuit may disable fill circuit. If this occurs, ensure adequate water supply for machine, then reset machine by turning power switch “OFF” for 1 second and then turning the power switch back “ON”.

NOTE: Watchdog timer might engage on initial fill on PIC 5 and PIC 6.

7.After the water tank has filled, allow 15-45 minutes (45-60 minutes for PIC 5/6) for the water to reach operating temperature. (Green ready light will illuminate when tank is up to preset temperature.)

8.Remove the powder hoppers, rotate the dispense elbow to the “up” position, and fill with desired powder product. IMPORTANT: Check to make sure that the auger inside the hopper is correctly installed prior to

filling. Reinstall powder hoppers. Turn dispense elbow down toward the mixing funnel.

9.Peel protective film off photo merchandiser cover. (Install graphic if needed)

10.Install flavor decals as needed. (Place one on each hopper, and place the corresponding decal on the

dispense section of the front door of the unit)

POWER CORD TABLE

Models

Volts

Watts

Phase

Supply Cord

Attachment Plug

Agency

 

 

 

 

 

 

 

Standard

120V

1400W

 

14-3

5-15

UL, CUL, NSF

 

 

 

 

 

 

120V

1650W

Single

14-3

5-15

UL, NSF

Models

 

 

 

 

 

120V

1650W

Phase

12-3

5-20

UL, CUL, NSF

 

 

 

 

60Hz

 

 

 

Q

120/208-240

2500W

12-4

L14-20

UL, CUL, NSF

 

 

 

 

 

 

 

 

Z*

208-240

2500W

 

12-4

L14-20

UL, CUL, NSF

 

 

 

 

 

 

 

* For Z model neutral is not required.

Start-Up Procedures for Pump Units (PIC 2P & PIC 3P only)

NOTE: Pump units are not designed to be plumbed to pressurized water source.

1.Place a five gallon water container within 3 feet vertically and 2 feet horizontally of the machine.

2.Drop the hose at the rear of the machine into the water container (The hose should extend to approximately 1” from the bottom of the water container.)

Page 4

Crathco® Powdered Beverage Dispensers

 

 

Image 4
Contents Crathco Powdered Beverage Dispensers Advertencia Crathco Powdered Beverage Dispensers Installation Start-up Procedure for Standard UnitsStart-Up Procedures for Pump Units PIC 2P & PIC 3P only Water Inlet ConnectionAdjustments How to Dispense a Cup of CappuccinoPortion Adjustment Thermostat Adjustment Drink Strength AdjustmentCleaning Drink Strength Adjustment for Model PIC3E or PIC33AEWeekly Weekly Reassembling the Hoppers PIC 1/2/3/5/6 Refer to FigureWeekly Cleaning Quarterly CleaningPIC Preventative Maintenance Checklist Every 6 to 12 months To Prepare for Shipment ServiceDraining the Tank PIC 2/3/4 230V Whipper Motor Replacement Kit # Quantity Description 120V Whipper Motor Replacement Kit # Quantity DescriptionPurging Machine of All Water for Shipment in Cold Areas Removal of Whipper Motors Figure QCrathco Powdered Beverage Dispensers Removal of Inlet Valve Figure CCRemoval of Thermistor Thermistor CurveRemoval of Auger Motors Removal of Blower MotorRemoval of Controller Removal of Heater RelayCrathco Powdered Beverage Dispensers Troubleshooting Guide Problem Probable Cause Corrective ActionTroubleshooting Guide PIC 1 Chassis Parts PIC 1 Hopper Bracket PIC 1 Door Assembly PIC 1 Tank Assembly Units with serial numbers beginning with L or TUnits with serial numbers beginning with T $2!7.Ĥ 63097 PIC 2/3 Chassis Parts PIC 2/3 Hopper Bracket PIC 2/3 Tank Assembly PIC 2/3 Door Assembly PIC 4 Chassis Parts PIC 4 Control Bracket Assembly BasePIC43A Control Bracket Assembly PIC 4 Hopper Bracket PIC 4 Hopper PIC 4 Tank Assembly OHPHQWPIC 4 Door Assembly PIC 4 Final Assembly PIC 5 Casing Assembly PIC 5 Base AssemblyPIC 5 Door Assembly Item NO. Part NO. DescriptionPIC 5 Hopper Bracket Assembly Hopper Brkt Asy PIC5Crathco Powdered Beverage Dispensers PIC 5 Final Assembly PIC5 Final AssemblyPIC 6 Casing Assembly PIC 6 Lid AssemblyPIC 6 Base Assembly 62876 62874PIC 5/6 Control Bracket Assembly PIC 6 Door AssemblyPIC 6 Hopper Bracket Assembly 62863PIC 6 Final Assembly PIC 1 120V and 120/240V Q Model Wiring PIC 1 230V E Model Wiring PIC1KE or PIC1KAE, 230V E Model Wiring PIC1K or PIC1KA 120 & 120/240 Q Model Wiring PIC1KAEW or PIC1KEW Wiring CAP1AE or CAP1E 230V E Model Wiring PIC 2/3 120 & 120/240V Q Model Wiring Crathco Powdered Beverage Dispensers PIC33AE 230V CE Model Wiring with 3-Portion Touch Pads PIC 2/3 100 & 200V J Model Wiring Crathco Powdered Beverage Dispensers Crathco Powdered Beverage Dispensers PIC 4 Wiring PIC43A 120V & PIC43AQ 120/240V Wiring PIC43AZ and PIC43AWZ Model Wiring with 3-Portion Touchpad PIC4Z, PIC4AZ, PIC4WZ, PIC4AWZ 240V Model Wiring PIC 5/6 Wiring Crathco Powdered Beverage Dispensers Grindmaster Corporation

CC-302-20 specifications

The Grindmaster CC-302-20 is a highly regarded coffee brewing machine designed for cafes and restaurants that require both quality and efficiency. This model stands out for its user-friendly features and advanced brewing technology, making it a popular choice among coffee enthusiasts and professionals alike.

One of the main features of the Grindmaster CC-302-20 is its programmable brewing cycles. This allows operators to customize brew times and temperatures according to their specific coffee offerings. The machine can brew up to 3 gallons of coffee per cycle, ensuring that businesses can meet high demand during peak hours without compromising on quality.

A significant characteristic of the CC-302-20 is its digital display, which provides real-time information on brewing status and alerts for maintenance needs. This feature ensures that users can monitor the brewing process at a glance, minimizing the chance of over-brewing or under-brewing coffee. The machine also includes an automatic shut-off function, which enhances energy efficiency and safety.

The Grindmaster CC-302-20 incorporates advanced brewing technology, notably its precision temperature control system. This system guarantees that water is heated to the optimal brewing temperature, which is crucial for maximizing the extraction of coffee flavors. This feature is particularly beneficial for cafes that pride themselves on serving high-quality, flavorful coffee.

Additionally, the CC-302-20 is designed with a durable, stainless steel construction, ensuring long-lasting performance in busy commercial environments. Its compact footprint makes it suitable for various countertop sizes, while the sleek design contributes to an appealing aesthetic in any coffee shop or restaurant.

Maintenance is another critical aspect of the Grindmaster CC-302-20. The machine is engineered for easy access to components, making it simple for staff to clean and service as needed. Regular maintenance routines can help extend the life of the equipment and maintain optimum brewing performance.

In conclusion, the Grindmaster CC-302-20 coffee brewer is an exceptional choice for establishments seeking a reliable, efficient, and high-quality brewing solution. Its programmable features, precision temperature control, and durable design make it an investment that meets the demands of busy coffee environments while consistently delivering delicious brews.