Grindmaster CC-302-20 service manual PIC Preventative Maintenance Checklist Every 6 to 12 months

Page 11

PIC Preventative Maintenance Checklist (Every 6 to 12 months)

A preventative maintenance visit should be performed every 6 to 12 months, depending on usage. The following procedures should be performed during a preventative maintenance visit.

Parts Required: One PM parts kit (PIC1 - Qty1 - 62707, PIC2 - Qty2 - 62707 or Qty1 - 60933, PIC3 - Qty1 - 60933, PIC4 - Qty1 - 60933 and Qty1 - 62707, PIC5 - Qty2 - 60933, PIC6 - Qty2 - 60933).

Tools Required: 11/32 nut driver, needle nose pliers, phillips head screwdriver, food grade lubricant.

The following procedures should be performed by a qualified service technician.

￿WARNING - Risk of electric shock and burns. Disconnect power before servicing. Use care in handling hot liquids.

1.Document model and serial number of equipment above.

2.Disconnect unit from power supply and turn power off. Then remove all access panels.

3.Shut off the water supply valve to the machine.

4.Open front door of unit and remove product hoppers. Clean hoppers following procedures on the decal on panel behind hoppers or as stated in instruction manual.

5.Remove the plenum chamber access panel, if so equipped (located below hoppers on newer units). Wipe out exposed plenum.

6.Locate the tank drain hose. It is located behind the bottom access panel. It is a white silicone tubing that has a 3/8” stainless steel barb plug and a black 5/8” hose clamp on it.

7.PIC 1, 2, 3, and 4: Using a 5 gallon, heat resistant container, route the drain hose into the container. PIC 5 and 6 contain over 5 gallons of hot water and require a minimum 6 gallon heat resistant container.

Remove the clamp, pinch the tube and remove the plug. Drain all of the water out of the tank into the container (about

3.5 gallons). Warning: the water from the tank is very hot (180°F plus). May cause burns and/or personal injury. Hot water may splash. Do not attempt to stop flow of hot water once it begins flowing through drain hose. Replace the drain hose plug and secure the clamp back onto the drain hose. Place the drain hose back inside the machine, to its original location. Carefully empty the drain bucket. Do not refill the unit at this time. Delime tank if needed.

8.Remove the mixing funnel shroud and mixing funnel from each chamber. Remove and discard the o-ring on the mixing funnel. Set the shroud and funnel aside.

9.Remove each whipper chamber and whipper blade. Check for wear and replace if necessary. Then remove and discard the small whipper shaft o-rings from each dispense head.

10.Remove the two screws from each whipper base and save the screws. Discard the old whipper base and slinger washer, and replace with the new parts in the PM kit.

11.Clean the whipper motor shaft and clean all dried product in this area under where the whipper base was located.

12.Install the new slinger washer onto the whipper motor shaft, and up to hopper mounting bracket.

13.Lubricate inside of whipper base with a food grade lubricant. Then install whipper base over the whipper motor shaft and check alignment of holes. If alignment is off, rotate base 180° to make sure holes line up. Hold base securely, and carefully tighten mounting screws.

14.Check whipper motor shaft to ensure it can turn freely using fingers. If shaft is hard to turn, remove screws, rotate base 180°, and re-tighten.

15.Install the new, red, small o-rings, along with the whipper blades, and whipper chambers. Clean the funnel shrouds and funnels. Install each new funnel o-ring and lubricate. Then install funnel and shroud. When complete, put the plenum chamber access panel back in place, if so equipped.

16.Remove plenum through side access hole and remove the plenum hose(s) from the blower to the plenum chamber. Clean the plenum and either clean or replace the hose(s) (part# 61123, not in kit). Re-install clean parts.

17.Remove the dump valves located behind side access panels, by loosening the dump valve bracket nuts with the 11/32 nut driver and lifting bracket up. Then pull dump valve from grommet and then remove the grommets from the tank with needle nose pliers and discard. Then remove the o-rings from the dump valves and discard. Replace with new tank grommets and new o-rings for each valve. Re-install the dump valves and secure back onto the tank. Tighten nuts on dump valve bracket.

18.Locate power supply and verify proper electrical supply to unit.

19.Find the water supply line. Turn on water supply, and verify adequate water flow.

20.Turn power supply back on. Then turn main power switch to “on”.

21.Verify water tank in unit is filling. After the tank is full, verify that the heating cycle has started.

22.Allow unit to fill and shut off. Check around dump valves and any tubing for signs of water leaks.

23.Replace all access panels and reinstall hoppers inside the unit. Verify nut on back of hopper is secure.

24.Verify each dispense head is operating properly and that the settings are correct. Adjust if necessary.

25.Check for proper product temperature and check mix ration for proper setting, and adjust if necessary.

26.Review proper care, cleaning and maintenance procedures with store personnel.

Crathco® Powdered Beverage Dispensers

Page 11

 

 

Image 11
Contents Crathco Powdered Beverage Dispensers Advertencia Crathco Powdered Beverage Dispensers Water Inlet Connection InstallationStart-up Procedure for Standard Units Start-Up Procedures for Pump Units PIC 2P & PIC 3P onlyPortion Adjustment How to Dispense a Cup of CappuccinoAdjustments Drink Strength Adjustment Thermostat AdjustmentDrink Strength Adjustment for Model PIC3E or PIC33AE CleaningWeekly Reassembling the Hoppers PIC 1/2/3/5/6 Refer to Figure WeeklyQuarterly Cleaning Weekly CleaningPIC Preventative Maintenance Checklist Every 6 to 12 months Draining the Tank PIC 2/3/4 ServiceTo Prepare for Shipment Purging Machine of All Water for Shipment in Cold Areas 120V Whipper Motor Replacement Kit # Quantity Description230V Whipper Motor Replacement Kit # Quantity Description Figure Q Removal of Whipper MotorsCrathco Powdered Beverage Dispensers Figure CC Removal of Inlet ValveThermistor Curve Removal of ThermistorRemoval of Heater Relay Removal of Auger MotorsRemoval of Blower Motor Removal of ControllerCrathco Powdered Beverage Dispensers Problem Probable Cause Corrective Action Troubleshooting GuideTroubleshooting Guide PIC 1 Chassis Parts PIC 1 Hopper Bracket PIC 1 Door Assembly Units with serial numbers beginning with L or T PIC 1 Tank AssemblyUnits with serial numbers beginning with T $2!7.Ĥ 63097 PIC 2/3 Chassis Parts PIC 2/3 Hopper Bracket PIC 2/3 Tank Assembly PIC 2/3 Door Assembly PIC 4 Chassis Parts Base PIC 4 Control Bracket AssemblyPIC43A Control Bracket Assembly PIC 4 Hopper Bracket PIC 4 Hopper OHPHQW PIC 4 Tank AssemblyPIC 4 Door Assembly PIC 4 Final Assembly PIC 5 Base Assembly PIC 5 Casing AssemblyItem NO. Part NO. Description PIC 5 Door AssemblyHopper Brkt Asy PIC5 PIC 5 Hopper Bracket AssemblyCrathco Powdered Beverage Dispensers PIC5 Final Assembly PIC 5 Final Assembly62874 PIC 6 Casing AssemblyPIC 6 Lid Assembly PIC 6 Base Assembly 62876PIC 6 Door Assembly PIC 5/6 Control Bracket Assembly62863 PIC 6 Hopper Bracket AssemblyPIC 6 Final Assembly PIC 1 120V and 120/240V Q Model Wiring PIC 1 230V E Model Wiring PIC1KE or PIC1KAE, 230V E Model Wiring PIC1K or PIC1KA 120 & 120/240 Q Model Wiring PIC1KAEW or PIC1KEW Wiring CAP1AE or CAP1E 230V E Model Wiring PIC 2/3 120 & 120/240V Q Model Wiring Crathco Powdered Beverage Dispensers PIC33AE 230V CE Model Wiring with 3-Portion Touch Pads PIC 2/3 100 & 200V J Model Wiring Crathco Powdered Beverage Dispensers Crathco Powdered Beverage Dispensers PIC 4 Wiring PIC43A 120V & PIC43AQ 120/240V Wiring PIC43AZ and PIC43AWZ Model Wiring with 3-Portion Touchpad PIC4Z, PIC4AZ, PIC4WZ, PIC4AWZ 240V Model Wiring PIC 5/6 Wiring Crathco Powdered Beverage Dispensers Grindmaster Corporation

CC-302-20 specifications

The Grindmaster CC-302-20 is a highly regarded coffee brewing machine designed for cafes and restaurants that require both quality and efficiency. This model stands out for its user-friendly features and advanced brewing technology, making it a popular choice among coffee enthusiasts and professionals alike.

One of the main features of the Grindmaster CC-302-20 is its programmable brewing cycles. This allows operators to customize brew times and temperatures according to their specific coffee offerings. The machine can brew up to 3 gallons of coffee per cycle, ensuring that businesses can meet high demand during peak hours without compromising on quality.

A significant characteristic of the CC-302-20 is its digital display, which provides real-time information on brewing status and alerts for maintenance needs. This feature ensures that users can monitor the brewing process at a glance, minimizing the chance of over-brewing or under-brewing coffee. The machine also includes an automatic shut-off function, which enhances energy efficiency and safety.

The Grindmaster CC-302-20 incorporates advanced brewing technology, notably its precision temperature control system. This system guarantees that water is heated to the optimal brewing temperature, which is crucial for maximizing the extraction of coffee flavors. This feature is particularly beneficial for cafes that pride themselves on serving high-quality, flavorful coffee.

Additionally, the CC-302-20 is designed with a durable, stainless steel construction, ensuring long-lasting performance in busy commercial environments. Its compact footprint makes it suitable for various countertop sizes, while the sleek design contributes to an appealing aesthetic in any coffee shop or restaurant.

Maintenance is another critical aspect of the Grindmaster CC-302-20. The machine is engineered for easy access to components, making it simple for staff to clean and service as needed. Regular maintenance routines can help extend the life of the equipment and maintain optimum brewing performance.

In conclusion, the Grindmaster CC-302-20 coffee brewer is an exceptional choice for establishments seeking a reliable, efficient, and high-quality brewing solution. Its programmable features, precision temperature control, and durable design make it an investment that meets the demands of busy coffee environments while consistently delivering delicious brews.