Grindmaster CC-302-20 Removal of Auger Motors, Removal of Blower Motor, Removal of Controller

Page 18

Removal of Auger Motor(s)

1.Disconnect power.

2.Remove front and side access panels.

3.Remove hoppers.

4.Remove three screws and lock washers. (Figure NN)

5.Pull motor out of slot. (Figure OO)

6.Disconnect wire connection.

7.Replace motor as needed.

Figure NN

Figure OO

Removal of Blower Motor

1.Disconnect power.

2.Drain tank. (see page 12)

3.Remove rear access panel.

4.Disconnect black hose from fan.

5.Disconnect hose from inlet valve if needed.

6.Remove two screws from side.

7.Remove fan. (Figure PP)

8.Disconnect wires.

9.Replace motor as needed.

Figure PP

Removal of Controller

1.Disconnect power.

2.Remove front access panels.

3.Carefully remove connectors from controller. (Do not pull on wires.)

4.Carefully press black clips back and pull out controller. (Do not pull on controller components - pull only on green board.)

5.Carefully remove controller. (Figure QQ)

(Handle controller only on edges of green board.)

6.Replace controller as needed.

Removal of Heater Relay

1.Disconnect power.

2.Remove front access panels.

3.Remove wires from relay. (Note locations of wires before removing.)

4.Remove screws and lift out relay. (Figure QQ)

5.Replace relay as needed.

 

 

Heater

 

Ballast

Transformer

Relay

 

p/n 61196

p/n 61481

p/n 61131

Controller

Figure QQ

Removal of Transformer

1.Disconnect power.

2.Remove front access panels.

3.Remove wires from transformer. (Note locations of wires before removing.)

4.Remove screws and lift out transformer. (Figure QQ)

5.Replace transformer as needed.

Page 18

Crathco® Powdered Beverage Dispensers

 

 

Image 18
Contents Crathco Powdered Beverage Dispensers Advertencia Crathco Powdered Beverage Dispensers Start-Up Procedures for Pump Units PIC 2P & PIC 3P only InstallationStart-up Procedure for Standard Units Water Inlet ConnectionHow to Dispense a Cup of Cappuccino AdjustmentsPortion Adjustment Thermostat Adjustment Drink Strength AdjustmentCleaning Drink Strength Adjustment for Model PIC3E or PIC33AEWeekly Weekly Reassembling the Hoppers PIC 1/2/3/5/6 Refer to FigureWeekly Cleaning Quarterly CleaningPIC Preventative Maintenance Checklist Every 6 to 12 months Service To Prepare for ShipmentDraining the Tank PIC 2/3/4 120V Whipper Motor Replacement Kit # Quantity Description 230V Whipper Motor Replacement Kit # Quantity DescriptionPurging Machine of All Water for Shipment in Cold Areas Removal of Whipper Motors Figure QCrathco Powdered Beverage Dispensers Removal of Inlet Valve Figure CCRemoval of Thermistor Thermistor CurveRemoval of Controller Removal of Auger MotorsRemoval of Blower Motor Removal of Heater RelayCrathco Powdered Beverage Dispensers Troubleshooting Guide Problem Probable Cause Corrective ActionTroubleshooting Guide PIC 1 Chassis Parts PIC 1 Hopper Bracket PIC 1 Door Assembly PIC 1 Tank Assembly Units with serial numbers beginning with L or TUnits with serial numbers beginning with T $2!7.Ĥ 63097 PIC 2/3 Chassis Parts PIC 2/3 Hopper Bracket PIC 2/3 Tank Assembly PIC 2/3 Door Assembly PIC 4 Chassis Parts PIC 4 Control Bracket Assembly BasePIC43A Control Bracket Assembly PIC 4 Hopper Bracket PIC 4 Hopper PIC 4 Tank Assembly OHPHQWPIC 4 Door Assembly PIC 4 Final Assembly PIC 5 Casing Assembly PIC 5 Base AssemblyPIC 5 Door Assembly Item NO. Part NO. DescriptionPIC 5 Hopper Bracket Assembly Hopper Brkt Asy PIC5Crathco Powdered Beverage Dispensers PIC 5 Final Assembly PIC5 Final AssemblyPIC 6 Base Assembly 62876 PIC 6 Casing AssemblyPIC 6 Lid Assembly 62874PIC 5/6 Control Bracket Assembly PIC 6 Door AssemblyPIC 6 Hopper Bracket Assembly 62863PIC 6 Final Assembly PIC 1 120V and 120/240V Q Model Wiring PIC 1 230V E Model Wiring PIC1KE or PIC1KAE, 230V E Model Wiring PIC1K or PIC1KA 120 & 120/240 Q Model Wiring PIC1KAEW or PIC1KEW Wiring CAP1AE or CAP1E 230V E Model Wiring PIC 2/3 120 & 120/240V Q Model Wiring Crathco Powdered Beverage Dispensers PIC33AE 230V CE Model Wiring with 3-Portion Touch Pads PIC 2/3 100 & 200V J Model Wiring Crathco Powdered Beverage Dispensers Crathco Powdered Beverage Dispensers PIC 4 Wiring PIC43A 120V & PIC43AQ 120/240V Wiring PIC43AZ and PIC43AWZ Model Wiring with 3-Portion Touchpad PIC4Z, PIC4AZ, PIC4WZ, PIC4AWZ 240V Model Wiring PIC 5/6 Wiring Crathco Powdered Beverage Dispensers Grindmaster Corporation

CC-302-20 specifications

The Grindmaster CC-302-20 is a highly regarded coffee brewing machine designed for cafes and restaurants that require both quality and efficiency. This model stands out for its user-friendly features and advanced brewing technology, making it a popular choice among coffee enthusiasts and professionals alike.

One of the main features of the Grindmaster CC-302-20 is its programmable brewing cycles. This allows operators to customize brew times and temperatures according to their specific coffee offerings. The machine can brew up to 3 gallons of coffee per cycle, ensuring that businesses can meet high demand during peak hours without compromising on quality.

A significant characteristic of the CC-302-20 is its digital display, which provides real-time information on brewing status and alerts for maintenance needs. This feature ensures that users can monitor the brewing process at a glance, minimizing the chance of over-brewing or under-brewing coffee. The machine also includes an automatic shut-off function, which enhances energy efficiency and safety.

The Grindmaster CC-302-20 incorporates advanced brewing technology, notably its precision temperature control system. This system guarantees that water is heated to the optimal brewing temperature, which is crucial for maximizing the extraction of coffee flavors. This feature is particularly beneficial for cafes that pride themselves on serving high-quality, flavorful coffee.

Additionally, the CC-302-20 is designed with a durable, stainless steel construction, ensuring long-lasting performance in busy commercial environments. Its compact footprint makes it suitable for various countertop sizes, while the sleek design contributes to an appealing aesthetic in any coffee shop or restaurant.

Maintenance is another critical aspect of the Grindmaster CC-302-20. The machine is engineered for easy access to components, making it simple for staff to clean and service as needed. Regular maintenance routines can help extend the life of the equipment and maintain optimum brewing performance.

In conclusion, the Grindmaster CC-302-20 coffee brewer is an exceptional choice for establishments seeking a reliable, efficient, and high-quality brewing solution. Its programmable features, precision temperature control, and durable design make it an investment that meets the demands of busy coffee environments while consistently delivering delicious brews.