Vulcan-Hart GS25E ML-52633 GS, GL & GT Series Fully Steam Jacketed GAS Kettles, General

Page 4

Installation, Operation and Care of

GS, GL & GT SERIES

FULLY STEAM JACKETED GAS KETTLES

KEEP THESE INSTRUCTIONS FOR FUTURE USE

GENERAL

Your Vulcan steam jacketed kettle is produced with quality workmanship and material. Proper installation, usage and maintenance will result in many years of satisfactory performance.

Vulcan-Hart Company suggests that you thoroughly read this entire manual and carefully follow all of the instructions provided.

INSTALLATION

Prior to installation check the electrical service and type of gas supply (natural or propane) to make sure they agree with the specifications on the machine data plate located on the lower-left inside front cover.

UNPACKING

This kettle was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the kettle is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.

LOCATION

Position the kettle in its final location. Check that there are sufficient clearances for operating and servicing the kettle, and for proper clearance of the cover when raised. Keep the kettle free and clear from all combustible substances. Minimum clearance from combustible and non- combustible construction is 2" (5.0 cm) at the rear and 6" (15.2 cm) at each side.

The kettle draw off valve should be located near a floor drain.

Do not obstruct the flow of air into and around the kettle. This air flow is necessary for proper combustion of gases and for ventilation of the kettle. Provisions for ventilation and incoming air supply for the equipment in the room must be in accordance with the National Fuel Gas Code ANSI Z223.1 (latest edition).

LEVELING

Place a spirit level on the rim of the kettle with the cover open. Turn the feet in or out to level the kettle in both the left-to-right and front-to-rear directions.

– 4 –

Image 4
Contents Installation Important for Your Safety For Your SafetyTable of Contents GS, GL & GT Series Fully Steam Jacketed GAS Kettles InstallationGeneral Installation Codes and Standards Testing the GAS Supply SystemGAS Connection FlueElectrical Connection Faucet BracketBefore First USE Operation LID Kettle Jacket On OFF Switch Food DRAW-OFF Valve Shutdown Cleaning Daily Kettle Food Draw-Off ValveMaintenance