Vulcan-Hart ML-126748, ML-126745, ML-126744, ML-126747, VC4EC, C4ED Assembling Stacked Ovens

Page 6

ASSEMBLING STACKED OVENS

Unpack the ovens and the stack kit. Position the oven to be used as the bottom oven on its left side for access to the oven bottom, taking care not to scratch or damage it.

Attach the four leg assemblies with the 24 bolts and lockwashers (six per leg).

Place the lower oven (with legs) on the floor and remove two 7/16" (11 mm) diameter knockouts on each side of the top cover.

Install two locating studs to the bottom of the top oven per stacking kit instructions.

Move the oven with legs to the installed position. Place the upper oven on top of the lower oven using the locating studs.

Remove the optional rear panel, if provided, from the TOP oven. Install the Stacking Flue (Fig. 3) with the four screws provided. Replace the top oven rear panel, if provided.

STACKING FLUE

PL-53463

Fig. 3

– 6 –

Image 6
Contents Installation Table of Content VC Series Electric Convection Ovens GeneralInstallation Assembling the Stand to the Oven Electrical ConnectionsElectrical Data Assembling Stacked Ovens Electrical Connections Stacked Ovens Operation Controls Models VC4ED/VC6EDPreheating Using Models VC4ED/VC6EDBefore First USE All Models CookingControls Models VC4EC/VC6EC Menu SelectManually Setting the Temperature and Cook Time To Program Menu Item and Rack Number Cook TimesStarting a Timed Cycle On All Racks Always Set the Temperature Before Setting the TimeTo Display the Actual Oven Temperature To End a Cooking CycleProper Utensils Setting the Oven for Roast & HoldRoast & Hold Operation Models VC4EC and VC6EC Operating HintsCooking Guidelines Holding Feature Cooking GuidelinesCleaning Standard Cooking Time ChartPower Outage Optional Stainless Steel Oven InteriorMaintenance Service and Parts InformationReplacing Lamps