Vulcan-Hart CMR34 operation manual GAS Connections

Page 7

TOP SUPPORT BRACKET

TOP

SUPPORT

BRACKETS

RAIL

 

PL-40722-1

 

 

 

 

 

 

 

 

 

PL-40723-1

Fig. 5

 

Fig. 6

5.Line up holes on top brackets. Attach self-tapping screw to each top bracket, and attach 3/8-16 bolt to each top bracket. Bolt thread through weld-nut on rail (beam support).

6.Reassemble bottom cover on cheesemelter (8 screws).

7.Attach shelf to back riser if included.

GAS CONNECTIONS

CAUTION: All gas supply connections and any pipe joint compound used must be resistant to the action of propane gases.

Codes require that a gas shutoff valve be installed in the gas line ahead of the cheesemelter.

Install the pressure regulator to the top gas connection. The arrow on the regulator indicates the direction of the gas flow (Fig. 7).

The regulator must be installed within the tower in an upright position. If it is mounted in any other position, the pressure must be reset (Fig. 8).

GAS CONNECTION

 

GAS PRESSURE

 

 

GAS PRESSURE REGULATOR

 

REGULATOR

 

 

IN UPRIGHT POSITION

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PL-40724-1

 

 

 

 

 

 

 

 

PL-40725-1

Fig. 7

 

Fig. 8

— 7 —

Image 7
Contents Installation For Your Safety Important for Your SafetyUnpacking Installation Location Assembly Free Standing Models Installation Codes and StandardsAssembly Over Heavy Duty Gas Range Assembly Over Gas Restaurant Range GAS Connections Testing the GAS Supply System Controls Fig OperationSeasonal Shutdown Recipe and Rack AdjustmentLighting the Pilot Light Nightly ShutdownLoading and Unloading MaintenanceCleaning Service and Parts InformationProblem Possible Causes Troubleshooting