GE JVB93 warranty Install the Downdraft, Install the Ductwork, Install the Electrical Wiring

Page 10

INSTALLATION INSTRUCTIONS

(continued)

Install the Downdraft

Mounting screws

Leveling bracket– flange facing out

Leveling bracket– flange facing in

1.Set the downdraft into the opening. Extend the leveling brackets to the floor of the cabinet so the downdraft sits straight. (NOTE: Leveling brackets can be removed and reattached in other positions. The bottom flange may have to face inward in tight cabinet installations.)

2.Secure the downdraft to the countertop

as follows: Hold the downdraft against the back of the countertop cut-out and tighten the 2 mounting screws (one on each end of unit) on the underside of the countertop. Use a wood shim between the screw and the underside of granite countertops.

3.Screw the leveling brackets to the bottom of the cabinet. Tighten the screws holding the leveling bracket to the unit on each side.

Install the Ductwork

CAUTION–BEFORE CUTTING A HOLE IN CABINET FOR DUCTWORK: Check for interference with floor joists, wall studs, electrical wiring or plumbing.

314x 10to 6RD. Transition

Blower

Collar

Screws6RD.

Elbow &

ductwork

1.Cut the hole in the cabinet as well as holes in the wall or floor as necessary.

2.Mount the roof or wall cap and work back toward the cabinet, attaching all ductwork, elbows and transitions as previously planned. Tape all ductwork connections to make them secure and air tight.

3.Connect the ductwork (and transition,

if required) to the downdraft. If necessary, LOOSEN wing nuts and screws that hold the blower in place, and slide the blower left or right to meet the ductwork. Retighten the screws and wing nuts.

NOTE: A 314″ x 10″ collar is provided for installers who prefer to rivet the cutwork to the unit. This will allow the blower to be removed and replaced easily in service situations without disturbing the ductwork.

Install the Electrical Wiring

1.Mount a standard wiring box, with

3-pronged outlet, inside the cabinet. Make sure the downdraft’s power cord can easily reach it.

2.Run the appropriate power cable into the cabinet and connect it to the outlet.

3.Plug the downdraft’s power cord into the outlet.

10

Image 10
Contents Problem Solver Safety Instructions Operating Instructions, TipsCare and Cleaning GE AppliancesRead and Save These Instructions Cooking Tips Using Your Downdraft Vent SystemServicing OFF Before Servicing the UnitProblem Possible Cause Care and CleaningQUESTIONS? USE this Problem Solver Do not use a steel wool pad it will scratch the surfaceSpecifications Installation InstructionsRequirements for an approved installation Tools You Will Need30″ COOKTOPS/DOWNDRAFT Units JVB93 Cutout for36″ COOKTOPS/DOWNDRAFT Units JVB96 JGP960SPlan the Ductwork Steps to Determine Flexible Ducting’s Equivalent LengthChanging Blower Discharge Optional Plan the WiringPreparation Down DischargeInstall the Ductwork Install the DowndraftInstall the Electrical Wiring Adjust the Switch Install the CooktopTo adjust position of activating switch Warranty

JVB93 specifications

The GE JVB93 is a sophisticated gas turbine designed for both industrial and utility applications, known for its exceptional efficiency and reliability. As part of GE's lineage of advanced gas turbines, the JVB93 incorporates cutting-edge technology to provide a competitive edge in terms of performance and environmental sustainability.

One of the primary features of the GE JVB93 is its high efficiency. The turbine boasts a thermal efficiency exceeding 45%, which translates to reduced fuel consumption and lower greenhouse gas emissions compared to traditional gas turbines. This efficiency is achieved through the utilization of advanced materials and innovative cooling techniques, enabling the turbine to operate at higher temperatures while maintaining structural integrity.

The JVB93 utilizes advanced aerodynamics in its compressor design, which optimizes airflow and improves overall performance. This state-of-the-art compressor is capable of handling variable operating conditions, ensuring reliable performance across a wide range of loads. The turbine also features a modular design, facilitating easier maintenance and quicker upgrades, ultimately reducing downtime and operational costs for users.

In terms of emissions control, the GE JVB93 is engineered with low NOx combustion technology. This means that the turbine produces significantly lower nitrogen oxides during operation, meeting stringent environmental regulations without compromising on performance. The combination of advanced burner technology and precise fuel management helps deliver clean and efficient power, making it an appealing option for companies focused on sustainability.

Another notable characteristic of the GE JVB93 is its versatility. The turbine can accommodate various fuel types, including natural gas, biogas, and liquid fuels, making it suitable for a range of applications from peaking power plants to continuous baseload operations. This adaptability allows facilities to optimize their fuel procurement strategies and enhance energy security.

Furthermore, the JVB93 is equipped with advanced digital technologies, allowing for real-time monitoring and predictive analytics. These capabilities enable operators to identify potential issues before they escalate, facilitating proactive maintenance strategies that enhance reliability and performance over time.

In summary, the GE JVB93 gas turbine stands out due to its high efficiency, low emissions, and advanced technology. Its modular design, versatile fuel capabilities, and digital integration make it an excellent choice for industries seeking to improve energy efficiency while adhering to environmental standards. This combination of features positions the JVB93 as a key player in the global push for cleaner, more sustainable energy solutions.