GE JP202 owner manual Optional installation over GE undersink dishwasher

Page 12

Care and Cleaning Operating Instructions Safety Instructions

Optional installation over GE undersink dishwasher

model GSM 2100. (if not installing the cooktop over a dishwasher, go to the next page)

Read these instructions completely and carefully.

Dimensions and Clearances for Optional Installation

13

 

A: 21 14

B: 16 58

C: 19 1516

D: 15 1516

E: 16 18

30Min.

F: 20 18

G: 10 116

H: 3

J: 2 Min.

K: 3 34Min.

Max.

A

B

H

 

 

 

 

 

 

 

 

 

D

C

 

 

 

 

 

 

 

 

 

 

 

 

 

134Min.

 

 

 

 

 

 

clearance to

 

 

 

 

 

 

side wall

 

 

 

 

 

F

K

 

 

 

 

 

 

 

 

 

 

 

G

 

 

 

 

 

J

E

 

 

 

 

 

 

 

 

 

 

 

134Min.

 

36

 

 

 

 

clearance to

 

 

 

 

 

side wall

 

 

 

 

 

 

Unit and cutout dimensions

Floor

 

 

 

 

 

 

 

 

 

Consumer Support Troubleshooting Tips Installation Instructions

This counter unit must be installed with the control knobs toward the front edge of the countertop.

Counter space must be provided for installation of the counter unit. When choosing the location of the cooktop and dishwasher, consider the following:

When installing over a dishwasher, cooktop models JP200, JP201 and JP202 are only approved for installation over GE Undersink Dishwasher model GSM2100. Install the dishwasher using the separate installation instructions packed with the dishwasher.

The cooktop should be easy to reach and lighted with natural light during the day.

To eliminate the risk of burns or fire by reaching over heated surface units, cabinet storage space located above the surface units should be avoided. If cabinet storage space is to be provided, the risk can be reduced by

installing a range hood that projects horizontally a minimum of 5″ beyond the bottom of the cabinets. Cabinets installed

above the counter unit may be no deeper than 13″ and must be at least 30″ above the cooktop.

The cooktop must be centered left to right over the dishwasher unit.

To insure accuracy, it is best to make a template when cutting the opening in the counter. See the illustration and chart above for all necessary dimensions.

The following minimum clearances must be maintained:

334 ″ minimum clearance between the front edge of the counter unit and the front edge of the counter.

30 ″ minimum vertical clearance from the cooktop to the nearest overhead surface.

15 ″ minimum vertical clearance to adjacent cabinets.

12

Image 12
Contents Cooktop Safety Precautions Ge.com Cook Meat and Poultry THOROUGHLY… Consumer SupportInstructions Care and Cleaning Installation Instructions Surface Cooking UnitsUsing the cooktop Instructions Safety InstructionsCleaning Operating Cooktop Controls How to Set the ControlsSafety RightWrong Cookware TipsDeep Fat Frying Wok CookingCare and cleaning of the cooktop Safety InstructionsOperating Instructions Control Knobs Porcelain Enamel Cooktop on some modelsSafety Surface Units and Drip PansTo remove a surface unit To replace a surface unitInstallation of the cooktop Before You BeginTools You Will Need Electrical RequirementsTypical installation location Dimensions and ClearancesOperating Instructions Care and Cleaning Following minimum clearances must be maintainedOptional installation over GE undersink dishwasher Dimensions and Clearances for Optional InstallationInstallation Instruction Troubleshooting Tips Consumer SupportSafety Instructions Before You Call For Service… Troubleshooting TipsBuilt-In Cooktop Warranty What is Not CoveredCare and Cleaning We Will ReplaceSchedule Service Parts and AccessoriesConsumer Support GE Appliances Website Real Life Design Studio

JP202 specifications

The GE JP202 is a revolutionary product that represents a significant advancement in the realm of energy generation technology. This cutting-edge gas turbine offers remarkable efficiency and reliability, making it an ideal choice for both utility and industrial applications. Designed by General Electric, a leader in energy solutions, the JP202 has been engineered to meet the growing demands for cleaner and more sustainable energy sources.

One of the main features of the JP202 is its high efficiency. The gas turbine operates with an efficiency rating of up to 64%, positioning it as one of the most efficient gas turbines in its class. This efficiency not only results in reduced fuel consumption but also contributes to lower greenhouse gas emissions, aligning with global goals for environmental sustainability.

The JP202 utilizes advanced aerodynamics and materials technology that enable superior performance under various operating conditions. Its advanced cooling technologies allow for higher operating temperatures, which are crucial for improving overall efficiency. The turbine's combustion system is engineered to minimize NOx emissions, further enhancing its environmental performance without compromising on power output.

Another key characteristic of the JP202 is its modular design. This makes maintenance and upgrades easier, ensuring that operators can maximize uptime and reduce operational costs. The design facilitates quick access to critical components, which allows for streamlined service and maintenance routines.

The turbine is equipped with a sophisticated digital control system that enhances its operational flexibility. This system utilizes advanced analytics and machine learning algorithms to optimize performance in real-time. Operators can monitor and control the turbine remotely, allowing for improved decision-making and operational efficiency.

In addition to its technological innovations, the GE JP202 is designed with versatility in mind. It can operate on various fuel types, including natural gas, biogas, and other renewable fuels, allowing facility operators to adapt to changing fuel markets and regulations. Its design is suitable for combined cycle operations, which further enhances its efficiency by capturing waste heat to produce additional power.

In summary, the GE JP202 combines high efficiency, innovative technologies, and a modular design to provide a powerful solution for modern energy needs. Its commitment to reducing emissions and promoting sustainability makes it a valuable asset for energy generation, ensuring reliable power while supporting environmental goals. This turbine is poised to play a significant role in the transition to cleaner energy sources.