Vermont Casting G600 manual Planningyourinstallation, $h*G

Models: G600

1 30
Download 30 pages 19.92 Kb
Page 11
Image 11
PLANNINGYOURINSTALLATION

PLANNINGYOURINSTALLATION

":$h*G'*

FIGURE1

ROTJND

SUPPORT

8ox/wALl-

THIMBLE

VEFTICAL

TERMINATION

STORMCOLLAR

CATHEDRAL

CEILING

IptpF.suPPoFT8OI l.ENqrH

tPIPE I.ENGTH

FIGURE2

I

er t:

ljrr

:l:

! : :

Yt

5i

:+

THEREARETWOBASTCTYPESOF DIRECTVENTSYSTEMINSTALLATION:

11,' HorizontalTermination(Fig.1)

2l VerticalTermination(Fig.2)

When planningyour instattation,it will be necessaryto select the proper lengthof vent pipefor your particularrequirementslt. is importantto note the wall thickness.Selectthe amountof verticalrise desiredfor "vertical- to - horizontal" installationsTo. determinethe lengthof vent pipe requiredfor

type

verticalinstallations,measurethe distancefrom the apptianceflue outtetto the ceiling,the ceilingthickness,the verticatrise in an attic or secondstory

and allow for sufficient vent height above the roofline. For two-story applications,

firestopsarerequiredat eachfloor level.lf an offsetis neededin the attic,additionalpipeandelbowswiil be required.

1 1

€.,'

Page 11
Image 11
Vermont Casting G600 manual Planningyourinstallation, $h*G