Vermont Casting G600 manual to install the Round SupporrBoxMatl, FlG

Models: G600

1 30
Download 30 pages 19.92 Kb
Page 17
Image 17
Step 3. to install the Round SupporrBoxMatl

from the roof to the hole previouslydrilled in the ceiling, and mark the spot where the vent will penetratethe roof. Determine if ceiling joists, roof rafters, or olher framing will obstruct the venting system. You may wish to relocate the appliance, or to offset, as shown in Fig. 13,to avoid cuttingloadbearingmembers.

Step 3. to install the Round SupporrBoxMatl

Thimble in a flat ceiling, cut a 10-inch square hole in the ceiling,centredon the hole drilled in Step 2. Framethe hole as shownin Fig.12.

Step 4. Assemble the desired lengths of Black Pipe and Elbows necessaryto reachfrom the Appliance adaptor up through the Round Support Box. Insure that all pipe and Elbow connectionsare in their fully twist-lockedposition.

Step 5. Cut a hole in the roof centredon the small drill hole placedin the roof in Step2. The hole should be of sufficientsize to meet the minimumrequirementsfor clearance to combustibles.

Step 6. Connecta section of pipe and extendup throughhole.

,\

,\

FlG. 14

NOTE:

1 )

2l

lf an offset is necessaryin the attic to avoid obstructions,it is importantto supportthe vent pipe every3 feet,to avoidexcessivestresson the ElLows,and possibleseparationwall. Strapsareavailablefor this purpose.(Fig.13)

Wheneverpossible,use 45" Elbowsinsteadof 90'Elbows.The 45" Elbowoffers less restrictionto the flow of fluegasesand intakeair.

1 7

Page 17
Image 17
Vermont Casting G600 manual to install the Round SupporrBoxMatl, FlG