LG Electronics MV1825SW, LMV1825SBQ service manual Checkout Procedures, Power Level

Page 29

COMPONENTS

TEST PROCEDURES

 

RESULTS

 

 

Check for continuity of relay 2 with an

POWER

 

 

 

LEVEL

 

 

 

ohm-meter.

 

 

 

 

 

 

 

(Remove wire leads from relay 2 and

1

4 sec

18 sec

 

operate the unit.)

2

6 sec

16 sec

 

 

 

Relay 2

3

8 sec

14 sec

 

 

4

10 sec

12 sec

RELAY2

 

5

12 sec

10 sec

 

 

 

 

6

14 sec

8 sec

 

 

7

16 sec

6 sec

 

 

8

18 sec

4 sec

 

Figure 32

9

20 sec

2 sec

 

 

 

 

10

22 sec

0

 

CAUTION : The relay connector 2 must

 

 

 

 

be correctly connected Relay 2.

 

 

 

NOTES:

A MICROWAVE ENERGY TEST MUST ALWAYS BE PERFORMED WHEN THE UNIT IS SERVICED FOR ANY REASON.

MAKE SURE THE WIRE LEADS ARE IN THE CORRECT POSITION.

WHEN REMOVING THE WIRE LEADS FROM THE PARTS, BE SURE TO GRASP THE CONNECTOR, NOT THE WIRES.

B. CHECKOUT PROCEDURES

(1) CHECKOUT PROCEDURES FOR FUSE BLOWING

CAUTION: REPLACE BLOWN FUSE WITH 20 AMPERE FUSE.

 

 

 

 

 

 

 

 

 

PROBLEMS

 

 

 

CAUSES

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuse blows immediately after

 

 

 

 

 

 

 

the door is closed.

 

 

 

 

 

 

 

 

 

 

 

Improper operation of the primary interlock, secondary

 

 

 

 

 

 

 

 

 

 

Fuse blows immediately after

 

 

 

interlock switches and/or the interlock monitor switch.

 

 

 

the door is opened.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fuse blows when the door is closed and START

 

 

 

Malfunction of the high voltage transformer; the high

 

 

 

key is touched.

 

 

 

voltage capacitor including the diode, the magnetron,

 

 

 

 

 

 

 

the blower motor or the circuit board.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES:

If the fuse is blown by an improper switch operation, replace the all Interlock switches, PCB Ass’y and the fuse at the same time. After replacing the the all Interlock switches, PCB Ass’y,Fuse with new ones, make sure that they are correctly connected.

Check for microwave energy leakage according to INTERLOCK ADJUSTMENT PROCEDURES on page 7-12 when the primary interlock, secondary interlock switches and/or the interlock monitor switches are adjusted or replaced.

7-18

Image 29
Contents Microwave Oven Safety Precautions in this ManualPage Table of Contents Specifications Microwave Radiation Grounding Instructions InstallationControl Panel Operating InstructionsControl Panel Instructions Schematic Diagram Overall Circuit DiagramMatrix Circuit for Touch KEY Board Trial Operation General Precautions in USEFeatures and Specifications Features Preliminary Precautions and Repair Service TipsEquipment Microwave Leakage TestMeasurement with the Outer Case Removed Power Output MeasurementImportant Notes Disassembly InstructionsHOW to Insert the F.P.C. Connector HOW to Remove the F.P.C. ConnectorRemoving the OUT CASEFigure Removing the Door Interlock Switches Figures 9,10 Removing Magnetron Removing Door Figure Removing Stirrer FANReplacing the Humidity Sensor Assembling DoorRemoving the Ventilation Motor Removing the Turntable Motor Interlock Mechanism Interlock SystemTest the Latch and Switch Sequence Interlock Continuity Test Components Test Procedure ResultsTest Procedures Test and Checkout PROCEDURES, and Trouble ShootingHIGH-VOLTAGE Diode FPC Connector Power Level Checkout ProceduresCheckout Procedures for Relay Problem a Checkout Procedures for Circuit Board Trouble Shooting Circuit board Poor Check the contact of relay 2see Normal Operation Circuit board Fuse Exploded View Control Panel Oven Cavity Latch Board Interior 50FZZA Installation Schematic Diagram of P.C.B Printed Circuit Board May