U-Line 2175BEVOL2 manual Inspect and Plan, General Precautions

Page 3

2175BEV/2175BEVOL2 Beverage Center

General Precautions

Use this appliance for its intended purpose only and follow these general precautions along with those listed throughout this guide:

WARNING

SHOCK HAZARD — Electrical Grounding Required.

Keep the unit unplugged throughout installation except during testing.

Never remove the round grounding prong from the plug and never use a two-prong grounding adapter.

Never use an extension cord to connect power to the unit.

Always keep your working area dry.

CAUTION

Use care when moving and handling the unit. Use gloves to prevent personal injury from sharp edges.

Do not lift the unit by the door or door handle.

Do not install the unit behind closed doors or in any way that would obstruct airflow to the front grille, which may cause the unit to malfunction.

2 Inspect and Plan

You have received a carton containing your 2175BEVS or 2175BEVOL2 Beverage Center with a package inside containing a Use and Care Guide, a Product Registration Card and an Anti-Tip Bracket Installation Kit. 2175BEVOL2 units are shipped with an additional package of hardware. Complete and mail the Product Registration Card or register online at www.U-LineService.com. Once your unit is installed, keep the Use and Care Guide and this Installation Guide in a safe place for future reference.

2175BEVS units are Stainless Steel. Stainless Steel units are covered with a protective coating and have been ordered left- or right-hand hinged. The Stainless doors are not reversible.

2175BEVOL2 units are Black with a door that requires the construction of a 3/4-inch thick wood overlay frame. You must determine left- or right-hand opening before construction.

All units come with maple trim wine racks that can be finished or stained. Please carefully follow the directions that apply to your unit and your intended design.

Tools/Materials Required

Screwdrivers — slotted and Phillips head

Sandpaper; low odor, water clean up, quick drying finish; tack cloth and, if desired, water-based wood stain and synthetic foam brush

3/4-inch overlay frame material, cutting tools, drill and bits (2175BEVOL2 units)

Inspection

Unwrap and inspect the unit on a flat, level surface capable of supporting its entire weight.

Removing Protective Coating

(Stainless Steel Units Only)

When inspecting/installing a Stainless Steel unit, the protective coating covering the unit must be removed first. Start at a corner of the unit/door and pull back the protective coating to remove it from the unit/door.

03/2008

3

www.U-LineService.com

Image 3 Contents
Installation Guide Follow Safety Precautions ContentsInspect and Plan General PrecautionsExterior Cleaning Cut-Out DimensionsPrepare Site Other Site Requirements Product Dimensions Door Swing/Clearances InformationSide-By-Side Installation Instructions Wine Rack Removal/InstallationPrepare Racks and Door Frame Staining and final finish application Wood Trim FinishingReversing the Door Door pivot plate Bottom hinge screw pin Frame Preparation Overlay FrameAttaching the Overlay Panel Prepare the NEW Overlay PanelAssembling Door to Cabinet Door closersAdjusting Door Alignment Adjust DoorChecking Door Alignment Electrical Specifications Installation TipLeveling Information Right-handed units shown, Left-handed units are mirrored Single Unit InstallationStart-Up for the First Time Start-Up TroubleshootingService Information Initial Start-Up