Summit BIM70 user manual Installation Types, Mobile installation, Enclosed Installation

Page 14

NOTE: The drain hose should never be allowed to hang or loop higher than the bottom of the ice storage bin.

3.All horizontal runs of drain lines must have a fall of ¼” per foot. An air gap will likely be required between the ice maker drain hose and the drain/waste receptacle. A stand pipe with a trap below it would be acceptable for the drain/waste receptacle. A floor drain is also acceptable.

4.Pour 1 gallon of water into the ice storage bin to check for leaks at all drain connections and at the nut of the drain water hole. Tighten any connections or nuts that leak.

Installation Types

This ice maker has been designed for Mobile (free-standing), Enclosed (as under a cabinet) or Built-in (sealed) installation, indoor or outdoor. In any case, there must be adequate air space around the unit for proper ventilation. (See diagrams on page 8.)

Mobile installation:

A mobile installation will allow you to install the ice maker free-standing in any place you desire provided you have access to a water supply. You must follow the stated instructions for

a.Electrical requirements

b.Water supply

c.Leveling the ice maker

Enclosed Installation:

An enclosed installation will allow you to install the ice maker under a cabinet or inside a kitchen cabinet provided the required clearance space around the ice maker is respected. This installation has the same requirements as a mobile installation.

Built-in Installation:

If this method of installation is chosen, it will still be necessary to allow adequate ventilation space around the unit. The following additional items must be observed.

1.Place ice maker in front of installation location. Remove the legs and place the unit flat on the floor or on a platform depending on your installation requirements.

2.The water supply line must be plumbed before connecting to the ice maker.

3.Connect the drain hose.

4.Turn on main water supply and tap. Check for water supply connection leaks. Tighten every connection (including connections at the water inlet).

5.If the electrical outlet for the ice maker is behind the cabinet, plug in the ice maker.

6.Push the ice maker into position.

7.Seal all around the cabinet to the floor with an approved caulking compound.

13

Image 14
Contents Automatic Ice Maker Table of Contents ICE Maker Safety Your safety and the safety of others are very importantImportant Safeguards Electrical Connection Technical Information Extension CordIntroduction Component Locations Unpacking ICE Maker InstallationCleaning before use Location RequirementsPage Recommended grounding method Electrical RequirementsElectrical Shock Hazard Tools required Leveling the Ice MakerWater Supply and Drain Connections Connecting the water line Drain LineEnclosed Installation Installation TypesMobile installation Built-in InstallationOperation Final Check List before OperationOperating Method How the Machine Makes IceNormal Sounds How the machine uses waterPreparing the Ice Maker for Long Storage What should be kept clean What shouldn’t be doneExterior Cleaning Condenser CleaningInterior Cleaning Cleaning the sprinklerPage Ice Making System Cleaning Page Descriptions of LEDs and buttons Ice Size Adjustment Guide Major Functions Troubleshooting Before Calling for ServicePage Limited Warranty Requesting Service BIM70 0M

BIM70 specifications

Summit BIM70 is a cutting-edge Building Information Modeling (BIM) software solution designed to enhance collaboration and streamline project management in the architecture, engineering, and construction (AEC) sectors. With its robust feature set and user-friendly interface, it has quickly become a preferred tool for professionals seeking to improve efficiency and accuracy in their workflows.

One of the standout features of Summit BIM70 is its advanced 3D modeling capabilities. Users can create highly detailed models that incorporate geometry, spatial relationships, and even attributes of building components. This allows for better visualization and communication among project stakeholders, ensuring everyone is on the same page from the initial design phase through to construction and maintenance.

Another key technology in Summit BIM70 is its real-time collaboration functionality. The platform supports multiple users working simultaneously on a single model, enabling teams to share updates, comments, and revisions instantly. This feature significantly reduces the likelihood of errors and miscommunication that can arise in traditional workflows, fostering a more integrated and cooperative working environment.

Summit BIM70 also incorporates powerful analytical tools that enable users to perform energy analysis, structural simulations, and cost estimates directly within the software. These capabilities allow for better decision-making early in the project lifecycle, leading to designs that are not only aesthetically pleasing but also energy-efficient and within budget constraints.

The software is compatible with various file formats and integrates seamlessly with other industry-standard applications, making it versatile and adaptable to existing workflows. Additionally, Summit BIM70 offers customizable templates and libraries, allowing users to standardize their processes and improve productivity.

In terms of user experience, Summit BIM70 features a sleek, intuitive interface that is easy to navigate, even for those who may be new to BIM technologies. Comprehensive training and support resources are also available, ensuring that users can maximize the platform's capabilities.

Overall, Summit BIM70 is at the forefront of BIM technology, offering a powerful suite of features designed to meet the evolving needs of the AEC industry. With its focus on collaboration, analysis, and ease of use, it is poised to help professionals deliver high-quality projects more efficiently than ever before.