Summit BIM70 user manual

Page 24

5.Allow 30 minutes for proper cleaning. After cleaning, shut off the power switch, and unscrew the nut of the water-draining hole on the rear of the unit. Drain off the waste water to some container, and then screw the nut on tightly when the waste water is fully drained off.

The ice machine cleaner contains acids.

DO NOT use or mix with any other solvent-based cleaning products.

Use rubber gloves to protect hands. Carefully read the material safety instructions on the container of the ice machine cleaner.

DISCARD the first batch of ice produced after cleaning.

6.Repeat steps 4 and 5 (without Ice Maker Cleaning Solution) to rinse the ice making system 3 times.

NOTE: The use of the Ice Maker Cleaner Solution in the water sump during the rinse is not needed.

7.Prepare a sanitizing solution made of 1 ounce of household bleach and 2 gallons of warm water (95º to 115º F). Remove the flake covers and slideway from the water sump and wipe the entire bin inside and out, covering the entire surface of the walls.

8.Fill a spray bottle with the sanitizing solution and spray all corners and edges, making sure to cover all surfaces with the solution. Soak the flake covers and slideway in the solution and put back in place after drying.

9.Allow the solution to be in contact for at least 3 minutes, then dry.

10.Repeat step 6 to rinse the ice making system one more time.

11.Reassemble the front cover.

12.Turn on the power again. The machine will return to the regular ice making mode. Discard the first batch of ice.

23

Image 24
Contents Automatic Ice Maker Table of Contents ICE Maker Safety Your safety and the safety of others are very importantImportant Safeguards Electrical Connection Technical Information Extension CordIntroduction Component Locations ICE Maker Installation Cleaning before useUnpacking Location RequirementsPage Electrical Requirements Electrical Shock HazardRecommended grounding method Leveling the Ice Maker Water Supply and Drain ConnectionsTools required Connecting the water line Drain LineInstallation Types Mobile installationEnclosed Installation Built-in InstallationOperation Final Check List before OperationOperating Method How the Machine Makes IceNormal Sounds How the machine uses waterPreparing the Ice Maker for Long Storage What should be kept clean What shouldn’t be doneExterior Cleaning Condenser CleaningInterior Cleaning Cleaning the sprinklerPage Ice Making System Cleaning Page Descriptions of LEDs and buttons Ice Size Adjustment Guide Major Functions Troubleshooting Before Calling for ServicePage Limited Warranty Requesting Service BIM70 0M

BIM70 specifications

Summit BIM70 is a cutting-edge Building Information Modeling (BIM) software solution designed to enhance collaboration and streamline project management in the architecture, engineering, and construction (AEC) sectors. With its robust feature set and user-friendly interface, it has quickly become a preferred tool for professionals seeking to improve efficiency and accuracy in their workflows.

One of the standout features of Summit BIM70 is its advanced 3D modeling capabilities. Users can create highly detailed models that incorporate geometry, spatial relationships, and even attributes of building components. This allows for better visualization and communication among project stakeholders, ensuring everyone is on the same page from the initial design phase through to construction and maintenance.

Another key technology in Summit BIM70 is its real-time collaboration functionality. The platform supports multiple users working simultaneously on a single model, enabling teams to share updates, comments, and revisions instantly. This feature significantly reduces the likelihood of errors and miscommunication that can arise in traditional workflows, fostering a more integrated and cooperative working environment.

Summit BIM70 also incorporates powerful analytical tools that enable users to perform energy analysis, structural simulations, and cost estimates directly within the software. These capabilities allow for better decision-making early in the project lifecycle, leading to designs that are not only aesthetically pleasing but also energy-efficient and within budget constraints.

The software is compatible with various file formats and integrates seamlessly with other industry-standard applications, making it versatile and adaptable to existing workflows. Additionally, Summit BIM70 offers customizable templates and libraries, allowing users to standardize their processes and improve productivity.

In terms of user experience, Summit BIM70 features a sleek, intuitive interface that is easy to navigate, even for those who may be new to BIM technologies. Comprehensive training and support resources are also available, ensuring that users can maximize the platform's capabilities.

Overall, Summit BIM70 is at the forefront of BIM technology, offering a powerful suite of features designed to meet the evolving needs of the AEC industry. With its focus on collaboration, analysis, and ease of use, it is poised to help professionals deliver high-quality projects more efficiently than ever before.