Summit BIM70 user manual Important Safeguards

Page 4

IMPORTANT SAFEGUARDS

Before the ice maker is used, it must be properly positioned and installed as described in this manual, so read the manual carefully. SUMMIT Appliance strongly recommends that you have a professional install your new machine. The warranty may be affected or voided by an improper installation. To reduce the risk of fire, electrical shock or injury when using the ice maker, follow basic precautions, including the following:

Plug into a grounded 3-prong outlet; do not remove grounding prong, do not use an adapter, and do not use an extension cord.

It is recommended that a separate circuit, serving only your ice maker, be provided. Use receptacles that cannot be turned off by a switch or pull chain.

Do not connect or disconnect the electric plug when your hands are wet.

Never clean ice maker parts with flammable fluids. Their fumes can create a fire hazard or explosion. Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. The fumes can create a fire hazard or explosion.

Before proceeding with cleaning and maintenance operations, make sure the power line of the unit is disconnected and the water line is shut off. (EXCEPTION: When cleaning the machine’s ice making system – see pages 22-23.)

Before operating, put all panels back into place.

Unplug the ice maker or disconnect power before cleaning or servicing. Failure to do so can result in electrical shock or death.

Do not attempt to repair or replace any part of your ice maker unless it is specifically recommended in this manual. All other servicing should be referred to a qualified technician.

When you disassemble the front cover, do not use too much force, as the wire leads connected to the power switch can be inadvertently disconnected.

Use two or more people to move and install the ice maker. Failure to do so can result in back or other injury.

To ensure proper ventilation for your ice maker, the front of the unit must be completely unobstructed. Choose a well-ventilated area with temperatures above 55ºF (13ºC) and below 80ºF (27ºC). This unit MUST be installed in an area protected from the elements, such as wind, rain, water spray or drips.

3

Image 4
Contents Automatic Ice Maker Table of Contents ICE Maker Safety Your safety and the safety of others are very importantImportant Safeguards Electrical Connection Technical Information Extension CordIntroduction Component Locations ICE Maker Installation Cleaning before useUnpacking Location RequirementsPage Electrical Shock Hazard Electrical RequirementsRecommended grounding method Water Supply and Drain Connections Leveling the Ice MakerTools required Connecting the water line Drain LineInstallation Types Mobile installationEnclosed Installation Built-in InstallationOperation Final Check List before OperationOperating Method How the Machine Makes IceNormal Sounds How the machine uses waterPreparing the Ice Maker for Long Storage What should be kept clean What shouldn’t be doneExterior Cleaning Condenser CleaningInterior Cleaning Cleaning the sprinklerPage Ice Making System Cleaning Page Descriptions of LEDs and buttons Ice Size Adjustment Guide Major Functions Troubleshooting Before Calling for ServicePage Limited Warranty Requesting Service BIM70 0M

BIM70 specifications

Summit BIM70 is a cutting-edge Building Information Modeling (BIM) software solution designed to enhance collaboration and streamline project management in the architecture, engineering, and construction (AEC) sectors. With its robust feature set and user-friendly interface, it has quickly become a preferred tool for professionals seeking to improve efficiency and accuracy in their workflows.

One of the standout features of Summit BIM70 is its advanced 3D modeling capabilities. Users can create highly detailed models that incorporate geometry, spatial relationships, and even attributes of building components. This allows for better visualization and communication among project stakeholders, ensuring everyone is on the same page from the initial design phase through to construction and maintenance.

Another key technology in Summit BIM70 is its real-time collaboration functionality. The platform supports multiple users working simultaneously on a single model, enabling teams to share updates, comments, and revisions instantly. This feature significantly reduces the likelihood of errors and miscommunication that can arise in traditional workflows, fostering a more integrated and cooperative working environment.

Summit BIM70 also incorporates powerful analytical tools that enable users to perform energy analysis, structural simulations, and cost estimates directly within the software. These capabilities allow for better decision-making early in the project lifecycle, leading to designs that are not only aesthetically pleasing but also energy-efficient and within budget constraints.

The software is compatible with various file formats and integrates seamlessly with other industry-standard applications, making it versatile and adaptable to existing workflows. Additionally, Summit BIM70 offers customizable templates and libraries, allowing users to standardize their processes and improve productivity.

In terms of user experience, Summit BIM70 features a sleek, intuitive interface that is easy to navigate, even for those who may be new to BIM technologies. Comprehensive training and support resources are also available, ensuring that users can maximize the platform's capabilities.

Overall, Summit BIM70 is at the forefront of BIM technology, offering a powerful suite of features designed to meet the evolving needs of the AEC industry. With its focus on collaboration, analysis, and ease of use, it is poised to help professionals deliver high-quality projects more efficiently than ever before.