Site Preparation

5

Before You Start

Make sure the opening dimensions, door clearance, electrical service and plumbing are correct for the model you are about to install. Refer to specifications on the following pages.

IMPORTANT NOTE: To operate properly, the door must open a minimum of 90°. Use a minimum 3" (76) filler in corner installations to assure a 90° door opening. Allow enough clearance in front of the unit for full door swing.

subzero.com/specs

TOOLS AND MATERIALS REQUIRED

Appliance dolly able to support 130 lbs (59 kg)

Level — 2' (.6 m) and 4' (1.2 m) recommended

Phillips and slotted screwdriver sets

Wrench set and allen wrench set

Crescent wrenches

Various sized pliers

5/16" hex bolt nut driver

Drill and assorted drill bits

Model UC-24CI—4' (1.2 m) of 1/4" copper, braided stainless steel or PEX tubing and saddle valve for water line (do not use self-piercing valves).

Model UC-24CI—Tubing cutter.

Masonite, plywood, 1/8" pressed fiberboard, cardboard or other suitable material to protect finished flooring

Image 5
Contents Undercounter Refrigeration Important Note ContentsLocation of rating plate Specifications Undercounter Specifications Undercounter ModelsOverall Dimensions Opening Dimensions Tools and Materials Required Site Preparation Before You StartModel UC-24CI Site Preparation Electrical RequirementsPlumbing Requirements Anti-Tip Bracket Undercounter Installation Unpack the UnitInstall Kickplate Undercounter InstallationLevel the Unit Position the Unit Water Line Connection Model UC-24CIModels UC-24R and UC-24CI Undercounter Installation Door PanelBeverage Center Model UC-24BG Outdoor Model UC-24ROUndercounter Installation Overlay Panel Installation Tenon centers Door frame cross section Top hinge adjustment Bottom hinge adjustment Undercounter Installation Installation Checklist Service Information Page SUB-ZERO, INC. P. O. BOX 44848 MADISON, WI 53744 SUBZERO.COM