Cornelius CH1500-CH7500 manual This page Left Blank Intentionally

Page 9

THIS PAGE LEFT BLANK INTENTIONALLY

91961OPR

6

Image 9
Contents Chiller Table of Contents Table of Contents cont’d Specification Notes General InformationIntroduction Location Installation Phase Protection / 3-Phase Option Adjustment Phase Protection / 3-Phase Option Electrical PlumbingChiller with Reservoir Auto Refill OptionChiller without Reservoir Chiller Plumbing Schematic with Pump and Tank Standard This page Left Blank Intentionally Thermostat Adjustment Start UPWater Flow START-UP Dual Point Adjustment Cooling Start-UpControl Panel 91961OPR Maintenance Fluid Recommendation Lab & Industrial Grade Ethylene GlycolCommercial/Automotive Antifreeze Power Light OFF TroubleshootingHigh Pressure Alarm Sample Data Plate for CH5002-A ServiceThis page Left Blank Intentionally LOW Temperature Control LTC Safety ControlsHigh Pressure Control HPC LOW Pressure Control LPCRefrigeration Piping Schematic with HOT GAS Bypass Index Description Parts ListPump and Tank Components Electrical BOX Components Warranty Page IMI Cornelius INC