Fig. 21 |
Fig. 22 |
–Secure the hood on the wall with the four screws b (Fig. 21).
–Establish the pipe connection.
–Establish the electrical connection.
–Stainless steel chimney only (LK
Note: Avoid damaging the sensitive metal surfaces.
–Fit the top of the chimney into the base. Make sure that the fastening holes on the side are at the top.
–Put both chimney parts onto the hood.
–Pull the chimney top duct up into its final position and secure the top duct unit with 2 screws on the ceiling holder (Fig. 22).
Note: Avoid scratching the surface when pulling out the top duct element, for example by placing the assembly template over the edge of the bottom chimney duct to protect it.
–Reinsert the grease filters.
–Place the glass plates on the appliance with the printed side facing down.
Note: When putting the glass trays in place, make sure that you do not scratch the chimney.
5750197383 en 11.01 SK | 17 |