CDA EVPK9 manual Installation

Page 12

Installation

11.Mount the upper chimney section onto the frame section and secure in position using the 2 screws (A) as in Fig 13.

12.Carefully slide the lower section over the upper section and tape it in position (L) near the shortest position.

13.Fit 2 screws into the holes on the body of the hood (O), leaving approximately 3mm protruding.

14.Mount the main motor body to the screws (O) through the keyed slots, as shown in Fig 14 and secure the body in position using 4 additional screws (N) and by tightening screws (O) firmly.

15.Connect the ducting pipe to the motor as shown in Fig 15.

16.Lower the lower chimney section into position by removing the tape. Take care not to let the chimney section drop onto the motor body.

Fig. 13

Fig. 14

Fig. 15

11

Image 12
Contents EVPK9 Linear Extractor Appliance information CE Declarations of ConformityPlease note Using your Extractor Care and Maintenance CleaningCleaning the grease filter Changing the charcoal filter re-circulating onlyChanging the Light Mains Electricity Connection Blue = NEUTRAL, Brown = LiveTroubleshooting Total rated power consumptionElectrical Information If your extractor is not workingMounting your Extractor Ducting and VentilationInstallation To mount your extractor to the ceilingInstallation Installation Installation Page Page Page Customer Care Department 01949 862