CDA EVPK9 manual Installation

Page 10

Installation

4.Insert 3 screws into the main fixings, leaving approximately 3mm protruding, as shown in Fig 7

5.Fit the upper support section (B) into position on the 3 screws and rotate it into position, as shown in Fig 7.

6.When in position, tighten the 3 main screws and fit an additional screw (X) to fix the support frame section in position.

7.Measure the height of the ceiling and then the hotplate height from the floor. The length of the support sections should be calculated as follows:

Length of support = Ceiling height – (127 + H + Hotplate height)

For gas hobs, H=700mm minimum

For electric hobs, H=600mm minimum

Note that if the exact height cannot be set, use the frame position corresponding to the next highest one.

8.Fit the lower section (B) to the upper section (C) at the correct height and secure in position using the supplied screws (G), as shown in Figs 8 and 9

Fig. 7

Fig. 8

Fig. 9

9

Image 10
Contents EVPK9 Linear Extractor CE Declarations of Conformity Appliance informationPlease note Using your Extractor Cleaning the grease filter Care and MaintenanceCleaning Changing the charcoal filter re-circulating onlyChanging the Light Mains Electricity Connection Blue = NEUTRAL, Brown = LiveElectrical Information TroubleshootingTotal rated power consumption If your extractor is not workingMounting your Extractor Ducting and VentilationInstallation To mount your extractor to the ceilingInstallation Installation Installation Page Page Page Customer Care Department 01949 862