Cannon 10565G, 10566G, 10560G, 10562G installation instructions Woburn

Page 1

WOBURN

Alkaline AA

NOTE: This appliance is fitted with a battery powered ignition system. Should the ignition system start to spark slowly - or not at all, the battery will need replacing. See the section on battery replacement.

Use and Installation Instructions

The cooker must be installed in accordance with the regulations in force and only used in a well ventilated space.

Read these instructions prior to using the cooker and retain them for future reference.

Part no. 4866200122-01

Image 1
Contents Woburn Contents Introduction Replacing a BatteryDisposal of Your Product Please read the precautions below before using your cooker For Your SafetyFor Your Safety To USE the Hotplate HotplateHOW to Deal with a FAT Fire Safety Requirements for Deep FAT FryingGrill PAN and Handle GrillTo USE the Grill Relighting the BurnerHigh Position Shelf Position FoodTo USE the Main Oven Main OvenRoasting of Large Poultry Cold Start CookingStorage and RE-HEATING of Food ‘COOK CHILL’ DishesMeat and Poultry Main Oven Cooking ChartYeast Mixtures Using the ‘SLOW COOK’ Setting for Slow Cooking ‘SLOW COOK’ SettingTOP Oven Guidance on Using the TOP OvenTo USE the TOP Oven TOP Oven Cooking Chart Gas Shelf Food Main Oven Heat Clean Linings Care and CleaningCooker Finish Cleaning Method Drop Down Doors Side Opening DoorsRemove the door inner glass as follows Refit the door inner glass as followsSomething Wrong With Your Cooker Problem CheckGAS Safety Installation & USE Regulations Installation InstructionsModel Number 10566G LocationGeneral Technical Data DimensionsNatural GAS LPG Models Cooker Hoods Space for FixingLevelling Unpacking the CookerStability Bracket Connecting to GAS Supply Installation and Operational Checks Key Contacts