EUROCHEF - PRO WALL HOOD
STEP 3A: INSTALL HOOD ONTO WALL (see enclosed template)
SKIP THIS STEP IF INSTALLING BENEATH A SOFFIT OR CABINET, GO TO STEP 3B.
•Affix enclosed paper template to wall.
•From the line indicating the bottom of the hood, measure 17” up and draw another line for the location of the Wood Bracket. See illustration.
•Locate at least 2 vertical studs at the Wood Bracket.
•Center the supplied Wood Bracket, left to right and below the marked line.
•Insert hood mounting screws in the Wood Bracket at the locations shown in the diagram, so screws protrudes 1/4". This 1/4” gap will provide clearance to hang the hood.
IMPORTANT: FRAMING MUST BE CAPABLE OF SUPPORTING UP TO 150 LBS
•Secure the Wood Bracket to 2 or more vertical studs, using at least 2 of the 4 supplied long screws.
IMPORTANT: Screws must penetrate at least
AFFIXING THE HOOD MOUNTING SCREWS
| x |
| ||
|
|
| ||
24” | 8” |
| ||
|
|
| ||
30” | 11” | 2” | ||
|
|
| ||
36” | 14” | |||
| ||||
|
|
| x | |
48” | 20” | |||
| ||||
|
|
| x | |
| 5/16” |
|
| |
| 1 |
|
| |
|
|
| Original Mounting | |
|
|
| ||
|
|
| Screws as Shipped |
Hang Hood On Wood Bracket
•Lift the hood and hold close to the installation location. Route house wiring through the knockout and into the junction box.
•Place the hood over the Wood Bracket. Be sure the mount- ing screws engage the keyhole slots in the back of the hood.
•Check to be sure the hood is level and centered.
•Use midpoint arrow in back of hood to confirm horizontal position.
24 | Centerline of | |
Installation Space | ||
|
Test Duct Cover Fit (do not install Duct covers)
•Place duct covers or recirculating cover over the top of the hood to check for gaps.
•Confirm that the ceiling gap, if any, is less then 3/8”.
•If gap is greater than 3/8", OR if duct covers do not fit, it is necessary to remove,
10 |
| |
|