Blodgett SHO-E manual Double Section Assembly, Oven Leveling

Page 11

Installation

Oven Assembly

DOUBLE SECTION ASSEMBLY

1.Secure the short legs to the bottom sections as described.

2.Place the upper section in position on top of the lower oven.

3.Attach the stacking brackets using the re- maining 5/16” bolts shipped with the ovens.

WARNING!!

When stacking ovens be sure to remove the single oven flue boxes prior to attach- ing three-piece connector.

OVEN LEVELING

After assembly, the oven should be leveled and moved to the operating location.

1.The oven can be leveled by adjusting the feet or casters located on the bottom of each leg.

Flue

Connector

Figure 6

7

Image 11
Contents SHO-E For Your Safety Reputation YOU can Count on Page Table of Contents AWG Oven Description and SpecificationsElectrical Specifications -- SH1E/AB IntroductionDelivery and Inspection Oven Location InstallationDelivery and Location Utility Connections --- Standards and Codes Canadian installationsGeneral export installations NSF Bolts Oven AssemblyLow Profile Casters for Double Stacked Ovens Caster AssemblyLEG Attachment Casters for Single and Double Stacked OvensOven Leveling Double Section AssemblyOperation OperationStandard Control Control DescriptionOperating Tips General Guidelines for Operating PersonnelSuggested Times and Temperatures Preventative Maintenance MaintenanceCleaning and Preventative Maintenance Cleaning the OvenPossible Causes Suggested Remedy Troubleshooting GuideCustomer Insert Wiring Diagram Here