Zephyr ZNA-M90S, ZNA-E42S manual Installation - Ducting Calculation Sheet

Page 7
Installation – Ducting Calculation Sheet

Duct pieces

Equivalent number

 

Total

 

length x used

=

 

3-1/ 4” x 10”

1 Ft.

x (

)

=

Ft.

Rect.,

 

 

 

 

 

straight

 

 

 

 

 

7” Round,

1 Ft.

x (

)

=

Ft.

straight

 

 

 

 

 

8” Round,

1 Ft.

x (

)

=

Ft.

straight

 

 

 

 

 

3-1/ 4” x 10”

15 Ft.

x (

)

=

Ft.

Rect.900

 

 

 

 

 

elbow

 

 

 

 

 

3-1/ 4” x 10”

9 Ft.

x (

)

=

Ft.

Rect.450

 

 

 

 

 

elbow

 

 

 

 

 

3-1/ 4” x 10”

24 Ft.

x (

)

=

Ft.

Rect.900

 

 

 

 

 

flat elbow

 

 

 

 

 

3-1/ 4” x 10”

30 Ft.

x (

)

=

Ft.

Rect.

 

 

 

 

 

wall cap

 

 

 

 

 

with damper

 

 

 

 

 

3-1/ 4” x 10”

5 Ft.

x (

)

=

Ft.

Rect.to

 

 

 

 

 

6” round

 

 

 

 

 

transition

 

 

 

 

 

3-1/ 4” x 10”

20 Ft.

x (

)

=

Ft.

Rect.to

 

 

 

 

 

6” round

 

 

 

 

 

transition

 

 

 

 

 

900 elbow

 

 

 

 

 

6” Round,

15 Ft.

x (

)

=

Ft.

900 elbow

 

 

 

 

 

6” Round,

9 Ft.

x (

)

=

Ft.

450 elbow

 

 

 

 

 

 

Subtotal column 1 =

Ft.

Maximum Duct Length: For satisfactory air movement, the total duct length of a 3 1/ 4” x 10” rectangular 6” or 7” diameter round duct should not exceed 100 equivalent feet.

Duct pieces

Equivalent number

Total

 

length x used

 

=

6”- 8”Round

30 Ft.

x (

)

=

Ft.

wall cap

 

 

 

 

 

with damper

 

 

 

 

 

6”- 8” Round, 30 Ft.

x (

)

=

Ft.

roof cap

 

 

 

 

 

6” round to

1 Ft.

x (

)

=

Ft.

3-1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

6” round to

16 Ft.

x (

)

=

Ft.

3-1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

900 elbow

 

 

 

 

 

7” or 8”

15 Ft.

x (

)

=

Ft.

Round,

 

 

 

 

 

900 elbow

 

 

 

 

 

7” or 8”

9 Ft.

x (

)

=

Ft.

Round,

 

 

 

 

 

450 elbow

 

 

 

 

 

7” or 8”

30 Ft.

x (

)

=

Ft.

Round

 

 

 

 

 

wall cap

 

 

 

 

 

with damper

 

 

 

 

 

7” or 8”

30 Ft.

x (

)

=

Ft.

Round,

 

 

 

 

 

roof cap

 

 

 

 

 

7” round to

8 Ft.

x (

)

=

Ft.

3 1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

7” round to

23 Ft.

x (

)

=

Ft.

3-1/ 4” x 10”

 

 

 

 

 

rect.

 

 

 

 

 

transition

 

 

 

 

 

900 elbow

 

 

 

 

 

 

Subtotal column 2 =

Ft.

 

Subtotal column 1 =

Ft.

 

Total ductwork

 

=

Ft.

Installation – Ducting Calculation Sheet

5

Image 7
Contents Napoli Island Use, Care, and Installation GuidePage Hood and Filter Cleaning Table of ContentsINSTALLATION MAINTENANCEREAD AND SAVE THESE INSTRUCTIONS Important Safety NoticeELECTRICAL REQUIREMENTS OPERATIONMODELS ZNA-M90S, ZNA-E42S PARTS SUPPLIED List of MaterialsInstallation - Ducting Calculation Sheet DUCTING Installation - Mounting Height & ClearanceSoffit or crawl space OptionsInstallation - Ducting WARNING FIRE HAZARDfront of hood Installation - Hood Specifications top of hood blower housing and ceiling bracketInstallation - Mounting the Hood 6. Lift lower duct cover and hood body onto bottom of support frame Mount hood onto support frameRECIRCULATING KIT REQUIRED IF NO DUCTING IS USED InstallationDuctless Recirculation Charcoal Filter ReplacementsLights On/Dim/Off Features & ControlsTouch Controls Adjust 6 Speed Levels 15 Min Delay Off 1. Blower On/OffSetting the Filter Change Reminder ReminderFilter Charcoal Filter Change Reminder charcoal filter, if installedMetal Filter Clean Indicator Filter Clean ReminderFeatures & Controls - Metal Mesh Metal Filter Clean Reminder metal mesh filterReplacing Metal Filters Maintenance - Hood and Filter CleaningSURFACE MAINTENANCE Metal FiltersCAUTION Light bulb becomes extremely hot when turned on Maintenance - LightsREPLACING LIGHT BULBS Cause TroubleshootingTROUBLESHOOTING PROCEDURES FOR NAPOLI ISLAND IssueDESCRIPTION List of Parts and AccessoriesReplacement Parts Optional AccessoriesJUN08.0101 Limited Warranty