Zephyr EBO-E42ASX, EBO-E36ASX manual Installation Instructions, Venting Methods, Preparation

Page 8

Installation Instructions

Closely follow the instructions set out in this manual.

All responsibility, for any eventual inconveniences, damages or fires caused by not complying with the instructions in this manual, is declined.

VENTING METHODS

The hood is equipped with a transition B for discharge of fumes to the outside (Ducting version).

Should it not be possible to discharge cooking fumes and vapour to the outside, the hood can be used in the Ductless (recirculating) version. Attach a charcoal filter and the deflector F on the duct cover support bracket G. Fumes and vapors are recycled through the top grille H by means of a duct connected to the transition B and the transition mounted on the deflector F.

NOTE: For ductless (recirculating) version only: purchase the Ductless Recirculating Kit.

Minimum Duct Size (Ducting/Ductless version): 8" Round Pipe.

 

 

 

Roof pitch w/

 

 

Roof pitch w/

Flashing and cap

 

 

Remote

 

 

Flashing and cap

ventilator

F-H-G

 

Pipe

Pipe

Pipe

 

 

Pipe

 

 

B

 

 

B

B

B

 

 

 

Side wall cap

 

 

 

with gravity

 

 

 

damper

Ductless

Ducting version

Ducting version

(recirculating)

with internal blower

with In-line blower

version

 

 

PREPARATION

Do not cut a joist or stud unless absolutely necessary. If a joist or stud must be cut, then a supporting frame must be constructed.

Fittings material is provided to secure the hood to most types of walls/ceilings.

However, a qualified technician must verify suitability of the materials in accordance with the type of wall/ceiling. The weight of the hood is:

Before making cutouts, make sure there is proper clearance within the ceiling or wall for exhaust vent.

Hood installation height above cooktop is the users preference. The lower the hood above the cooktop, the more efficient the capturing of cooking odors, grease and smoke.

The hood shall be installed at 24" minimum to 32" above the countertop. Check your ceiling height and the hood height maximum before you select your hood.

8

Image 8
Contents JAN06.0101 Page Table of Contents Important safety Notice Operation Electrical Requirements Electrical & Installation requirements Before Installing the Hood Parts not Supplied List of MaterialsParts Supplied Dimensions and clearances Preparation Installation InstructionsVenting Methods Installation Ductwork Calculation Sheet Installation Mounting height referenceBush + Screw Glass Electrical connection Electrical Grounding InstructionsInstall duct cover with 4 screws Description of the hood Reset filter saturation signal Description of the hood Control BallControls Description of control ball and hood operationRemote Control Maintenance Description of the hood Remote ControlUsing the Remote Control Maintenance CleaningGrease Filter Replacing the Light BulbTrouble Shooting Issue Cause What to doWarranty To Obtain Service Under WarrantyZRC-00BO List of Parts and AccessoriesGF02IA