Zephyr EBO-E42ASX, EBO-E36ASX manual Electrical connection, Electrical Grounding Instructions

Page 12

Installation

19.Connect ducting to transition. Seal with duct tape.

Do not use duct smaller than the transition.

For Ductless - recirculating - installations only: provide and install a duct to connect hood transition to deflector (the deflector is available as an extra kit).

20. Electrical connection

WARNING

Electrical Shock Hazard

Warning: Turn off power circuit at the service panel before wiring this unit.

120 VAC, 15 or 20 Amp circuit required.

ELECTRICAL GROUNDING INSTRUCTIONS

THIS APPLIANCE IS FITTED WITH AN ELECTRICAL JUNCTION BOX WITH 3 WIRES, ONE OF WHICH (GREEN/YELLOW) SERVES TO GROUND THE APPLIANCE. TO PROTECT YOU AGAINST ELECTRIC SHOCK, THE GREEN AND YELLOW WIRE MUST BE CONNECTED TO THE GROUNDING WIRE IN YOUR HOME ELECTRICAL SYSTEM, AND IT MUST UNDER NO CIRCUMSTANCES BE CUT OR REMOVED. Failure to do so can result in death or electrical shock.

Facing the front of the range hood, remove the left knockout and the Junction box cover and install the conduit connector (cULUS listed) in junction box.

knockout

J-Box cover

Conduit

J-Box cover

Connect black wire from service panel to black or red in junction box, white to white and green to green-yellow.

Close junction box cover.

21.Note: disregard this step if the hood has been fitted with an internal blower.

Purchase and install a In-line blower (see paragraph „Before installing the hood - Parts not supplied“ for model reference).

22.For Ductless (recirculating) installations

Install one charcoal filter (available as an extra kit).

23.Install filters.

Run 3 wires; black, white and green ,according to the National Electrical Code and local codes and ordinances, in 1/2" conduit from service panel to junction box.

12

Image 12
Contents JAN06.0101 Page Table of Contents Important safety Notice OperationElectrical & Installation requirements Before Installing the HoodElectrical Requirements List of Materials Parts SuppliedParts not Supplied Dimensions and clearances Installation Instructions Venting MethodsPreparation Installation Ductwork Calculation Sheet Installation Mounting height referenceBush + Screw Glass Electrical connection Electrical Grounding InstructionsInstall duct cover with 4 screws Description of the hood Reset filter saturation signal Description of the hood Control BallControls Description of control ball and hood operationDescription of the hood Remote Control Using the Remote ControlRemote Control Maintenance Maintenance CleaningGrease Filter Replacing the Light BulbTrouble Shooting Issue Cause What to doWarranty To Obtain Service Under WarrantyList of Parts and Accessories GF02IAZRC-00BO