Kobe Range Hoods CH0048SQB, CH0042SQB, CH0036SQB manual Duct Cover Installation

Page 14

Duct Cover Installation

5.Use 8” round steel pipe (follow building codes in your area) to connect the ducting transition on the hood to the ductwork above. Use duct tape to make all joints secure and air tight. Refer Figure 15. Slide the duct cover onto the hood.

6.Use 3/16” x 3/8” screws (included) to attach duct cover to hood.

Final Assembly

CAUTION: Install heating lamps last.

7.Drop oil tunnel into recess support near rear of hood. Refer to Figure 16.

8.Install baffle filters and stainless spacer(s). Refer to Measurements and Diagrams on page 21 for baffle filter and stainless spacer placement. Angle baffle filter toward back of hood ￿. Push baffle filter up until almost level ￿. Slide forward into recess behind the front of hood ￿. Lower baffle filter ￿. Slide back until it fits into resting position ￿.Angle baffle filter toward back of hood ￿. Refer to Figure 17.

9.Repeat for all baffle filters and spacers.

10.Install heating lamps (not included), 120 Volts 175 Watts max. each.

11.Turn power ON in control panel. Check all lights and fan operation.

12.Make sure to leave this manual for the homeowner.

11

Figure 15

Figure 16

Figure 17

Image 14
Contents Kobe Brand Range Hood This page Left Purposely Blank Contents Read and Save These InstructionsPage Page Components of Package Must keep all material for returns or refundsFor Wall Mount with Optional Duct Cover InstallationFor Under the Cabinet Installation Table of Contents Under the Cabinet Installation Make Sure Hood is Secure Before ReleasingF E T Y W a R N I N G Page Wall Mount Installation Hood Preparation Before InstallationWall Duct Cover Installation Turn on Turn OFFMaintenance To Replace Light Bulb Specifications Measurements & Diagrams For Under T HE Cabinet Page Rear Knockout Holes For Wall Mount with Optional Duct Cover Baffle Filter & Stainless Steel Spacers Parts List Optional Duct Cover Sold Separately Blower Assembly Electrical Assembly Circuit Diagram Model NO. CH0030SQB CH0036SQB Processor BoardProcessor Board Model NO. CH0042SQB CH0048SQBDisclaimer Claims will not be Accepted After the Allocated DaysTWO-YEAR Warranty Service Period WarrantyWarranty Certificate ConditionsImplied WARRANTIES/STATE LAW ServiceConsequential Damage Product Registration Record the Following Information for Your RecordThis page Left Purposely Blank VER.070601