Kobe Range Hoods
CH0048SQB, CH0042SQB, CH0036SQB
manual
Optional Duct Cover Sold Separately
Specifications
Install
Parts list
Measurements & Diagrams
Warranty
Maintenance
Blower Assembly
Service
Page 26
3
2
4
5
1
6
7
9
8
3
10
11
15
23
21
20
19
22
18
16
14
12
13
Optional Duct Cover (Sold Separately)
24
3
23
17A 17B
17C
17D
17
Page 25
Page 27
Image 26
Page 25
Page 27
Contents
Kobe Brand Range Hood
This page Left Purposely Blank
Contents
Read and Save These Instructions
Page
Page
Components of Package
Must keep all material for returns or refunds
For Wall Mount with Optional Duct Cover
Installation
For Under the Cabinet
Installation Table of Contents
Under the Cabinet Installation
Make Sure Hood is Secure Before Releasing
F E T Y W a R N I N G
Page
Wall Mount Installation
Hood Preparation Before Installation
Wall
Duct Cover Installation
Turn on
Turn OFF
Maintenance
To Replace Light Bulb
Specifications
Measurements & Diagrams
For Under T HE Cabinet
Page
Rear Knockout Holes
For Wall Mount with Optional Duct Cover
Baffle Filter & Stainless Steel Spacers
Parts List
Optional Duct Cover Sold Separately
Blower Assembly
Electrical Assembly
Circuit Diagram Model NO. CH0030SQB CH0036SQB
Processor Board
Processor Board
Model NO. CH0042SQB CH0048SQB
Disclaimer
Claims will not be Accepted After the Allocated Days
TWO-YEAR Warranty Service Period
Warranty
Warranty Certificate
Conditions
Implied WARRANTIES/STATE LAW
Service
Consequential Damage
Product Registration
Record the Following Information for Your Record
This page Left Purposely Blank
VER.070601
Related pages
Can I transfer my Polk Audio warranty if I sell my speakers?
Discover Polk Audio warranty transfer policies
Top
Page
Image
Contents