Zanussi ZGF 782 Installation, Gas Connection, Cut Out Size, Rectangular cut-out size for hob

Page 11

Installation

IMPORTANT

This hob must be installed by qualified personnel to the relevant British Standards.

Any gas installation must be carried out by a registered CORGI installer.

The manufacturer will not accept liability, should the above instructions or any of the other safety instructions incorporated in this book be ignored.

On the end of the shaft, which includes the GJ 1/2" threaded elbow, adjustment is fixed so that the washer is fitted between the components as shown in the diagram. Screw the parts together without using excessive force.

Gas Connection

Connection to the gas supply should be with either rigid or semi-rigid pipe, i.e. steel or copper.

The connection should be suitable for connecting to RC 1/2 (1/2 BSP male thread).

When the final connection has been made, it is essential that a thorough leak test is carried out on the hob and installation.

Ensure that the main connection pipe does not exert any strain on the hob.

It is important to install the elbow correctly, with the shoulder on the end of the thread, fitted to the hob connecting pipe.

Failure to ensure the correct assembly will cause leakage of gas.

Cut Out Size

The dimensions of the cut-out are given in the diagram.

FO 0814

FO 0264

A)End of shaft with nut

B)Washer

C)Elbow

Rectangular cut-out size for hob

 

min

.

 

55

 

 

 

 

 

480

 

 

 

 

 

560

 

Dimensions are given in mm.

150 min

 

FO 2038

12

Image 11
Contents GAS HOB Model ZGF During Use Important Safety InformationChild Safety ServiceContents Hob Top Installation When the HOB is First InstalledDescription of the Hob Burner Minimum Maximum Using the Wok StandOperation HOB BurnersBurners Maintenance and CleaningHobTop Pan Supports and Wok StandCustomer Care Service and Spare PartsSymptom Solution Something Not Working?Peace of Mind for 24 Months Zanussi Guarantee ConditionsExclusions This guarantee does not cover European GuaranteeCUT OUT Dimensions Instructions for the InstallerEngineer technical data Overall DimensionsLocation Important safety requirementsCut Out Size InstallationDimensions are given in mm Gas ConnectionFitting the Hob into the worktop BuildingThis HOB Must be Earthed Electrical connectionsIgnitor Switch Ignitor Unit Wiring DiagramEarth Continuity Check Fault FindingPreliminary Electrical Systems Check Ignition System / Gas Ignition Commissioning ProcedurePressure Testing Servicing To Adjust the GAS Rate