CLEAR HOSE TO DOOR PANEL CONNECTION
•Place the supplied rubber washer (17) inside the hex nut on the other end of the clear hose (15) (beverage delivery line) and attach to shank protruding from the door panel
DELIVERY HOSE ARRANGEMENT
•Insert the clear hose (15) (delivery hose) into the hose routing clips (8) attached to the door panel. Once the hoses are properly secured, the CO2 canister valve can now be opened.
(15)CLEAR HOSE
(15) CLEAR HOSE
DOOR PANEL
COUPLER TO KEG INSTALLATION
(8) HOSE ROUTING CLIPS
DOOR PANEL
•Align lug locks on tap head with lug housing on top of keg and insert the tap head.
•Turn the tap head handle ¼ turn clockwise. The tap head is now secured to the keg.
•Pull the tap handle out and push down to open the port in the keg.
CONNECTIONS
CO2 CANISTER TO CABINET INSTALLATION
•Place the CO2 canister (19) with the regulator (13) inside the CO2 Canister Bracket (4) in the cabinet. It is important that the canister be kept in an upright position to operate efficiently. Fasten the canister securely in place using the 4” long carriage bolt (6) and wing nut (7) supplied with this unit.
(19)CO2
| CANISTER |
|
|
| (6) 4” LONG |
(13) | CARRIAGE BOLT |
| |
REGULATOR |
|
(4) CO2 | (7) WING NUT |
CANISTER | |
BRACKET |
|
GENERAL OPERATION
SETTING THE TEMPERATURE CONTROL
The temperature control is located on the back side of the beverage cooler. The temperature is factory preset for satisfactory storage temperature. However, the temperature control is adjustable to provide a range of temperatures for your personal satisfaction. If a colder temperature is desired, turn the control shaft of the cold control clockwise using the tip of the screwdriver as shown in the diagram below. To set the cold control to “OFF” position, turn the control shaft
KEG TO CABINET INSTALLATION
•Place the keg next to the CO2 canister (19) inside the cabinet as shown.
(19)CO2
CANISTER
KEG
6