Aquatic SYMPHONY SERIES specifications Structural preparation, Types of Installations

Page 9

INSTALLATIONINSTRUCTIONS

structural preparation:

Framing and supports will vary according to the model and type of installation selected.

1.Plumbing Connections: (spout, handles, valves, etc.) should be made after unit is installed. When mounting fittings on unit, drill holes from finished surface, using appropriate-sized hole saw with fine-tooth or abrasive grit cutting edge.

2.When plumbing connections have been made, proceed with electrical hook-up (see Electrical Installation on page 8).

Types of Installations:

*Installation dimensions should be taken directly from the bathtub. Do not support the weight of the tub by its rim.

Alcove: Requires a skirt. Models shown with skirts have optional removable skirts. Other models not shown require a field built skirt, have an integral skirt, or no skirt is available.

1.a) Alcove Framing: Leveled 1” x 3” ledgers indicated height “LH” dimension (see Alcove Diagrams on page 9). Use a 3’ level. Nail ledgers to studs.

Island-- All Models: Above floor; no wall contact.

Peninsula -- All Models: Above floor; one end at plumbing wall.

Sunken (Partial or Full)-- All Models: Flush mount or self-rimming.

b)Island, Peninsula, Sunken Framing: Construct framework as shown in Island Diagrams on page 10, with inside (cutout) dimensions “IW” and “ID” and height dimension “DH”. (Full height framework required, even in sunken installations.) Check framework for proper dimensions, squareness and plumb. Use a 3’ (minimum) level.

2.a) Before moving unit into alcove or framework see and follow enclosed Electrical Installation instructions on page 8. (Electrical and air tube hook-ups will be difficult to perform if unit is installed first.)

b)Models with leveling feet: The following procedure is recommended for pre-leveled bottoms: Lift unit by the rim, place in alcove or framework. If necessary, shim feet until unit is completely resting on leveled ledges or framework. Secure the unit by fastening the bottom feet to the subfloor with any construction adhesive caulk. The use of cement mortar is suggested as a foundation bed between the floor and the bottom of the unit to suppress noise and give the rock solid feel for the user.

3.See and follow Sealing & Finishing diagrams (below) and System Test and Clean-Up on page 15.

(Not to support tub’s lip)

Aquatic Industries, Inc.



Image 9
Contents Iessymphony SER Page Table Of Contents Owner Information Aquatic Industries, IncCongratulations Aquatic Industries Customer Service CenterRead and Follow ALL Instructions Pre -planning access, Plumbing and electrical installation Pre -installation proceduresElectrical installation Installation InstructionsStructural preparation Types of InstallationsAlcoves Islands Removable Skirt Panel for Integrally Skirted Models Integrally skirted whirlpoolsFlat Panel Skirt Installation Instructions Flat Panel Skirt Installation InstructionsDetail view a Detail view b Base and plumbing may vary by model Aquatic Industries, Inc System test Clean-upOperation of Symphony Jet operations10A 10B 10C 10D 10E Whirlpool operations Before Your First UseTo operate your whirlpool Whirlpools Maintenance and care Whirlpool system cleaningJet Cleaning Water quality issues RepairMicrobiological Quality Treatment Chemical QualityFcc consumer information Whirlpool user informationSymptoms Possible problems Suggested solutions Troubleshooting GuideName Company Address City State Zip Replacement parts Order formPhone Fax Model # Color Purchase Date3c & d. Jet Symphony Replacement parts Order MapBody with Wall Fitting JetDescription COLOR/FINISH Symphony Replacement parts ListWhat Products are Covered Aquatic Industries, Inc. Limited WarrantyRevision #002 6/08