H Y D R A U L I C F E E D I N S T A L L A T I O N
HydraulicFeed
Installing the Optional Hydraulic Feed Kit(For models without factory
installed hydraulic feed.)
Install the Roller Assembly
1.Remove the bolts fastening the chipper chute to the rotor housing weldment.
2.Remove the chipper chute mounting plate.
3.Hold the roller assembly up to the rotor housing weldment. Secure the roller assembly with 3/8" x
4.Attach the chipper chute to the roller assembly with 3/8" x
Attach the Control Arm
1.Remove the canvas chipper chute flap and angle.
2.Fasten the cable anchor to the chipper chute with 3/8" x
3.Attach control pivot and extension hinge to the chipper chute bottom with 3/8" x
4.Put three 5/8" washers on both control pivot shafts.
5.Place the control arm shaft holes over the control pivot shafts.
6.Place a 5/8" bearing over each pivot shaft and fasten each bearing to the control arm with two 3/8" x 1" bolts and nuts.
7.Attach the feed control lever to the cable anchor weldment by inserting a 5/16" x 2" bolt through the bolt holes. Place the drift cutter spring over the end of the bolt. Secure the bolt and spring with a 5/16" washer and nut.
8.Put the detent ball into the detent cavity on the feed control lever. Insert the detent spring into the detent cavity. Secure the spring and the ball by threading a 3/8" x 1" bolt through a 3/8" nut and then threading the bolt into the detent cavity.
9.Connect the control arm to the feed control lever with the control tie rod strip. Place a 5/16" washer and an idler pivot spacer over a 5/16" bolt. Insert the bolt through the bolt hole in one end of the control tie rod strip and the top bolt hole on the feed control lever. Secure the bolt with a 5/16" washer and nut. Insert a 5/16" x 1" bolt (with a 5/16" washer and idler pivot spacer) through the other bolt hole in the control tie rod strip and the control arm. Secure with a 5/16" washer and nut.
19