Flange Nut Retainer Bracket
Shoulder Bolt
Lock Nut
Lift up
Handle
Figure 5
4.Place the hex opening of the hex nut retainer bracket over the flange nut securing the handle adjustment lock and install the lock nut on the lower shoulder bolt. See Figure 6.
Hex Hole in | Handle Adjustment |
Retainer Bracket | Lock |
over Flange Nut |
|
Figure 6
5.Pivot handle assembly into position desired. Tighten the bottom bolt and nut securely. Tighten the handle adjustment lock.
Gear Shift
Rod
| Handle |
| Adjustment Rod |
| (Model 420 Only) |
| Figure 7 |
| Gear Shift Rod |
Shift Cover | Opening |
|
Rubber Washer
Flat Washer
Hairpin Clip
Figure 8
3. Install the nut and
ATTACHING THE HANDLE ADJUSTMENT ROD
(Model 420 Only)
ATTACHING THE GEAR SHIFT ROD
NOTE: Model 420 tiller has two control rods. The gear shift rod is the longer rod.
1.Remove the
2.Insert the end of the gear shift rod through the opening in the top of the shift cover, and into the shift bracket. See Figure 8. Secure with rubber washer first, then flat washer and hairpin clip.
6
Handle
Adjustment
Rod
Positioner
Bracket
Hairpin
RubberClip
Washer
Figure 9