Yazoo/Kees ZEKW48190 manual 605 lbs

Page 69

 

 

TECHNICAL DATA

 

 

 

 

 

 

ZEKW48190/968999506

 

 

 

 

 

 

Equipment

 

 

 

 

 

 

 

Cutting width

48”

 

 

 

 

 

 

Cutting height

1.5”- 4.5”

 

 

 

 

 

 

Uncut circle

0

 

 

 

 

 

 

Number of blades

3

 

 

 

 

 

 

Blade length

16 1/4”

 

 

 

 

 

 

Nose rollers

Yes

 

 

 

 

 

 

Michigan Seat

Standard

 

 

 

 

 

 

Hinged armrests

Yes

 

 

 

 

 

 

Hour meter

Standard

 

 

 

 

 

 

Blade engagement

Electric Clutch

 

 

 

 

 

 

Deck construction

11 gauge w/ 10 gauge skirts

 

 

 

 

 

 

 

 

 

 

Productivity

 

 

 

 

 

 

 

Productivity

2.6 acres/h 10530 m2/h

 

 

 

 

 

 

Overall dimensions

 

 

 

 

 

 

 

Weight

605 lbs..

 

 

 

 

 

 

Base machine length

72”

 

 

 

 

 

 

Base machine width

45”

 

 

 

 

 

 

Base machine height

40”

 

 

 

 

 

 

Overall width, Chute up

50”

 

 

 

 

 

 

Overall width, Chute down

63”

 

 

 

 

 

 

 

 

 

English-67

Image 69
Contents Operator’s manual Models Page OPERATOR’S Manual ZE Rider ContentsEnglish-2 Introduction IntroductionManufacturing Number Good ServiceSymbols and Decals Symbols and DecalsXxxx xxxxxx Repair work Safety Instructions Safety InstructionsGeneral Operation English-8 Slope Operation Personal Safety EquipmentChildren Maintenance General Maintenance Risk of sparking Important Information TransportCustomer responsibilities Controls ControlsMotion Control Levers Parking Brake Seat adjustment boltsTracking Fuel Shut Off ValveRefueling Fuses By pass linkageIgnition Switch Hour MeterChoke Control Throttle Control Blade switchCutting height pedal AccessoriesOperation OperationTraining Starting the Engine Before StartingDepress the control for disengaging the mower deck Set the choke control USE Full Throttle When Mowing To remove cables, reverse order To start an engine with a weak batteryRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance MaintenanceMaintenance Schedule Nance Once Maintenance Each Before After 100 To clean battery and terminals BatteryReplacing battery Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking and Adjusting the Throttle Cable Checking and Adjusting the Choke CableChecking the Engines Cooling Air Intake Replacing the Air Filter Kawasaki Engine Replacing the Fuel Filter Checking the Fuel Pump’s Air FilterChecking Tire Pressures Checking the V-belts Checking the Parking BrakeDeck belt To replace deck beltDeck belt installation IZT belt removal IZT beltChecking the Blades Belt installationRemove blade bolt by turning counterclockwise Adjusting the Mower Deck Adjusting Cutting HeightLeveling To adjust anti-scalp rollers Use protective glasses when cleaning and washing Cleaning and WashingRemoval and installation of caster wheel Caster WheelsTo adjust parking brake Tracking adjustmentMower is tracking to the right Mower is tracking to the leftLubrication LubricationLubrication Schedule Change transaxles transmission filtersLubricating in Accordance with the Lubrication Schedule Lubricating the CablesFront Wheel Mount Front Wheel BearingsEngine Oil Changing the Engine Oil Deck outer spindleChecking the Oil Level Transaxle Transmission Fluid Change Changing the Engine Oil FilterExpansion Tank Purging Procedures Trouble Shooting Guide Trouble Shooting GuideProblem Cause Water in the fuel English-61 Storage ServiceStorage Winter StorageWiring diagram Wiring DiagramsTechnical Data Technical DataZEKW42170/968999295 ZEKW52210/968999296 Productivity KAI ZEKW48190/968999506605 lbs Torque Specifications Conformity Certificates Conformity CertificatesUSA requirements Service Journal Service JournalDelivery Service Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Hour Service English-73 English-74 English-75 At Least Once Each Year English-77 English-78 English-79 Page