Yazoo/Kees ZEKW48190 manual English-75

Page 77

SERVICE JOURNAL

Action

Date, mtr reading, stamp, sign

300-Hour Service

1.Inspect the machine. Come to agreement with the customer as to which additional work is to be carried out.

2.Perform the 25-hour service.

3.Perform the 50-hour service.

4.Perform the 100-hour service.

5.Check/adjust the mower deck.

6.Clean the combustion chamber and grind the valve seats.

7.Check the engine valve clearance.

8.Replace the air cleaner’s pre-filter (foam).

English-75

Image 77
Contents Operator’s manual Models Page OPERATOR’S Manual ZE Rider ContentsEnglish-2 Introduction IntroductionManufacturing Number Good ServiceXxxx xxxxxx Symbols and DecalsSymbols and Decals Repair work General Operation Safety InstructionsSafety Instructions English-8 Slope Operation Personal Safety EquipmentChildren Maintenance General Maintenance Risk of sparking Important Information TransportCustomer responsibilities Controls ControlsMotion Control Levers Parking Brake Seat adjustment boltsTracking Fuel Shut Off ValveRefueling Fuses By pass linkageChoke Control Ignition SwitchHour Meter Throttle Control Blade switchCutting height pedal AccessoriesTraining OperationOperation Starting the Engine Before StartingDepress the control for disengaging the mower deck Set the choke control USE Full Throttle When Mowing To remove cables, reverse order To start an engine with a weak batteryRunning Operating on hills Mowing Tips Stopping the Engine Moving by Hand Maintenance Schedule MaintenanceMaintenance Nance Once Maintenance Each Before After 100 To clean battery and terminals BatteryReplacing battery Always use protective glasses when handling the batteryIgnition System Checking the Safety System Checking the Engines Cooling Air Intake Checking and Adjusting the Throttle CableChecking and Adjusting the Choke Cable Replacing the Air Filter Kawasaki Engine Checking Tire Pressures Replacing the Fuel FilterChecking the Fuel Pump’s Air Filter Checking the V-belts Checking the Parking BrakeDeck belt To replace deck beltDeck belt installation IZT belt removal IZT beltChecking the Blades Belt installationRemove blade bolt by turning counterclockwise Leveling Adjusting the Mower DeckAdjusting Cutting Height To adjust anti-scalp rollers Use protective glasses when cleaning and washing Cleaning and WashingRemoval and installation of caster wheel Caster WheelsTo adjust parking brake Tracking adjustmentMower is tracking to the right Mower is tracking to the leftLubrication LubricationLubrication Schedule Change transaxles transmission filtersLubricating in Accordance with the Lubrication Schedule Lubricating the CablesFront Wheel Mount Front Wheel BearingsEngine Oil Changing the Engine Oil Deck outer spindleChecking the Oil Level Transaxle Transmission Fluid Change Changing the Engine Oil FilterExpansion Tank Purging Procedures Problem Cause Trouble Shooting GuideTrouble Shooting Guide Water in the fuel English-61 Storage ServiceStorage Winter StorageWiring diagram Wiring DiagramsZEKW42170/968999295 ZEKW52210/968999296 Technical DataTechnical Data Productivity KAI ZEKW48190/968999506605 lbs Torque Specifications USA requirements Conformity CertificatesConformity Certificates Service Journal Service JournalDelivery Service Action Date, mtr reading, stamp, signAfter the First 5-8 Hours Hour Service English-73 English-74 English-75 At Least Once Each Year English-77 English-78 English-79 Page