3
Setting Up
Your Log
Splitter
WARNING
Use extreme cau- tion unpacking this machine. Some components are very heavy and will require additional people or mechanical handling equipment.
NOTE: All references in this manual to the left or right side of the log splitter is from the operating position only. Exceptions, if any, will be specified.
Figure
Figure
B
2
1
A
Figure
WARNING: Use extreme caution unpacking this machine. Some components are very heavy and will require additional people or mechanical handling equipment.
NOTE: All references in this manual to the left or right side of the log splitter is from the operating position only. Exceptions, if any, will be specified.
Assembling the Tongue
Attaching the Jack Stand
The jack stand is shipped in the transport position.
1.Remove the spring clip and clevis pin and pivot the jack stand towards the ground to the operating position.
2.Secure the jack stand in position with the clevis pin and spring clip. See Figure
Attaching the Tongue
1.With the log splitter still standing upright, remove two hex bolts and hex nuts from the end of the tongue. See Figure
2.Align the holes in the tongue with the holes in the tank bracket and secure with hardware just removed. See Figure
NOTE: High pressure hose must be above the tongue assembly.
Connecting Cylinder to Beam
The log splitter is shipped with the beam in the vertical position.
1.Pull out the vertical beam lock, rotate it back, and pivot the beam to the horizontal position until it locks. See Figure
2.Disconnect the dislodger from the beam weld bracket by removing the six hex screws. See Figure
Figure
6